8125 San Fernando Way
Dallas, TX 75218
8125 San Fernando Way: 3 projects on record
City of Dallas lists 3 filings across 3 projects at 8125 San Fernando Way, Dallas, TX 75218 since May 30, 2025. The most recent, filed June 23, 2025, covers: “Rpz.......water filter system in yard...........sewerline repair yard by excavation up to 50 ft”.
Compiled from City of Dallas records · updated Jun 23, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Jun 23, 2025
- since May 30, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 8125 San Fernando Way
What is being built at 8125 San Fernando Way?
The latest filing (City of Dallas permit RES-PLM-25-001611, June 23, 2025) covers rpz.......water filter system in yard...........sewerline repair yard by excavation up to 50 ft.
How many permits and filings does 8125 San Fernando Way have?
3 filings across 3 projects, from May 30, 2025 to June 23, 2025.
Is there other construction near 8125 San Fernando Way?
Yes. Nearby filings include 8130 San Fernando Way (installation of a new underground gas line for a new 26kw generator. gas line is approximately 50' and will be using minimum 1" gas line and 1" flex risers, Jan 13, 2026); 8114 San Fernando Way (scope of work – hvac installation* furnish and install two (2) new complete hvac systems, including outdoor condensing units, indoor equipment, and all required accessories.* furnish and install new above-ceiling supply and return ductwork in accordance with the approved plans and required airflow.* furnish and install new below-floor supply and return ductwork as required.* furnish and install all required supply diffusers, return air grilles, registers, dampers, flex duct, fittings, transitions, and accessories.* fabricate and install required supply and return plenums for both hvac systems.* properly support, hang, seal, and insulate all new ductwork in accordance with applicable mechanical codes and project requirements.* furnish and install required refrigerant line sets, condensate drain piping, and equipment connections for both systems.* connect new hvac equipment to existing utilities where applicable. electrical service and gas piping beyond the immediate equipment connections are excluded unless otherwise specified.* seal all duct joints and connections to minimize air leakage and ensure proper system performance.* perform complete system startup, refrigerant charging, airflow balancing, and operational testing.* verify proper operation of both hvac systems upon completion.* remove and properly dispose of hvac-related construction debris generated from this scope of work, Aug 14, 2026); 1340 Waterside Dr (electrical for pool, Sep 11, 2026).
How do I get alerts for new permits at 8125 San Fernando Way?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75218- 8130 San Fernando WayJan 13, 2026Installation of a new underground gas line for a new 26kw generator. gas line is approximately 50' and will be using minimum 1" gas line and 1" flex risers · 18 m away
- 8114 San Fernando WayAug 14, 2026Scope of work – hvac installation* furnish and install two (2) new complete hvac systems, including outdoor condensing units, indoor equipment, and all required accessories.* furnish and install new above-ceiling supply and return ductwork in accordance with the approved plans and required airflow.* furnish and install new below-floor supply and return ductwork as required.* furnish and install all required supply diffusers, return air grilles, registers, dampers, flex duct, fittings, transitions, and accessories.* fabricate and install required supply and return plenums for both hvac systems.* properly support, hang, seal, and insulate all new ductwork in accordance with applicable mechanical codes and project requirements.* furnish and install required refrigerant line sets, condensate drain piping, and equipment connections for both systems.* connect new hvac equipment to existing utilities where applicable. electrical service and gas piping beyond the immediate equipment connections are excluded unless otherwise specified.* seal all duct joints and connections to minimize air leakage and ensure proper system performance.* perform complete system startup, refrigerant charging, airflow balancing, and operational testing.* verify proper operation of both hvac systems upon completion.* remove and properly dispose of hvac-related construction debris generated from this scope of work · 24 m away
- 1340 Waterside DrSep 11, 2026Electrical for pool · 140 m away
- 1328 Waterside DrSep 10, 2026Pipe pull water service + prv + double check · 141 m away
- 1320 Waterside DrApr 7, 2026One 50 gallon gas water heater in second floor walk in atic · 147 m away
- 1331 Waterside DrNov 18, 2020Replace or modify existing hvac · 153 m away
- 8200 San Fernando WayJul 29, 2026Installing piers · 162 m away
- 1315 Waterside DrJan 5, 2021Install car charging station · 163 m away
- 1303 Waterside DrDec 6, 2020Gas relay or repair with test · 173 m away
- 8123 Forest Hills BlvdAug 19, 2026Installing 7 total piers · 179 m away
- 1215 Waterside CirAug 10, 2026Replace existing 3-ton 14 seer outdoor condenser and matching attic evaporator coil (provide new drain pan); no furnace, ductwork, or thermostat replacement; no structural change · 186 m away
- 1219 Waterside CirSep 18, 2025Foundation repair-install 6 pilings · 191 m away