9215 Garland Rd
Dallas, TX 75218
Dallas permit records a disconnected house electrical panel
No new construction is identified at 9215 Garland Road. A City of Dallas residential electrical permit filed October 30, 2026, says no work was being done and notes that the house panel had been disconnected after a bill went unpaid.
Summarized from City of Dallas records · updated Oct 30, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Oct 30, 2026
- since Oct 30, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 9215 Garland Rd
What is being built at 9215 Garland Road?
The City of Dallas permit does not identify new construction. The residential electrical permit, filed October 30, 2026, says no work was being done.
What does the electrical permit for 9215 Garland Road say?
Permit RES-ELC-26-006767 says the house panel was disconnected after a bill went unpaid. Its description also says no work.
When was the permit filed for 9215 Garland Road?
The City of Dallas filed residential electrical permit RES-ELC-26-006767 on October 30, 2026.
How much will work at 9215 Garland Road cost?
The record does not list a project cost or reported valuation.
Is anything being built near Chase Casa Linda on Garland Road?
At 9215 Garland Road, about 213 meters from Chase Casa Linda - Relo Redev, the permit record describes no work and a disconnected house panel. It does not identify a new building.
Is there a construction project near Reformed Pilates on Garland Road?
The 9215 Garland Road permit, about 247 meters from Reformed Pilates, is a residential electrical permit filed October 30, 2026. It does not specify construction work.
Also being built nearby
All of 75218- 9219 Garland RdOct 5, 2025Electrical wiring · 4 m away
- 9211 Garland RdNov 11, 2026No work meter was removed due to nonpayment on the house panel · 4 m away
- 9201 Garland RdAug 27, 2026Gas leak between bldgs 8 & 9 by meter · 14 m away
- 9304 Angora StJan 20, 2026Drain repipe · 92 m away
- 9326 Angora StSep 29, 2025We will then tunnel approximately 50ft under home to expose old cast iron sewer lines. we will then remove old cast iron and replace with schedule 40 pvc. bid also includes running a new water main from the front yard towards the home. will add a homeowner shut off valve before entering crawlspace. includes all new water connections through the floor. this includes both bathrooms, kitchen and washer** scope change **we will be replacing the entire sewer line and we are going to be replacing two fifty gallon water heaters with new units as well. the sewer line portion will be replaced with brand new schedule 40 pvc · 104 m away
- 9331 Angora StJun 9, 202626kw kohler generator installation · 106 m away
- 9335 Garland RdNov 5, 2025Repair gas line · 124 m away
- 9343 Garland RdJan 28, 2021Install swimming pool · 132 m away
- 9352 Angora StSep 24, 2025Gas test using air pressure. the property is a duplex, but since we are doing only one unit, i registered the permit as a residential single family. this is the way the buildng inspection office told me to do so i wouldn't get charged for two units of the duplex residence · 141 m away
- 9365 Garland RdSep 8, 2026New main circuit breaker and generator with ats · 155 m away
- 9371 Garland RdFeb 23, 2026Service release no work · 161 m away
- 9337 San Fernando WayNov 10, 2020Remove existing roof and install new roof · 187 m away