9838 Van Dyke Rd
Dallas, TX 75218
Dallas home undergoing a full interior remodel
City of Dallas permits filed July 8 through August 12, 2026, indicate a full interior remodel of the existing house at 9838 Van Dyke Rd. The work includes new insulation, mechanical, electrical and plumbing systems, finishes, and HVAC.
Summarized from City of Dallas records · updated Aug 12, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Aug 12, 2026
- since Jul 8, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsNsfaa this is an interior remodel. the house has been gutted to the studs. new insulation, mep systems and finishes will be installed
Nsfaa this is an interior remodel. the house has been gutted to the studs. new insulation, mep systems and finishes will be installed
City of Dallas permitResidential Alteration Addition Permit
Sources: City of Dallas
Questions about 9838 Van Dyke Rd
What is being built at 9838 Van Dyke Rd?
City of Dallas permits indicate an interior remodel of an existing house, not a new home. The July 8, 2026, permit describes the house as gutted to the studs.
When were permits filed for the remodel at 9838 Van Dyke Rd?
The four City of Dallas permits were filed between July 8 and August 12, 2026.
What work is planned inside the house at 9838 Van Dyke Rd?
The permits describe new insulation, mechanical and electrical systems, plumbing and fixtures, and interior finishes.
Is the house at 9838 Van Dyke Rd getting new HVAC?
Yes. City of Dallas permit RES-MEC-26-004378, filed August 12, 2026, describes installation of new HVAC.
Are the plumbing and electrical systems being remodeled at 9838 Van Dyke Rd?
The permits indicate plumbing work with new plumbing and fixtures, plus electrical alterations as part of the remodel. The plumbing permit was filed August 3, 2026, and the electrical permit on August 6, 2026.
Also being built nearby
All of 75218- 9818 Van Dyke RdDec 7, 2020Build swimming pool and spa · 37 m away
- 9827 Champa DrSep 25, 2025Replace 14 linear ft of sidewalk. 14x4 -56 sq ft · 99 m away
- 9916 Van Dyke RdJul 10, 2026Wreck and haul off debris from residential structure. scrape lot for positive drainage · 144 m away
- 407 Kirkwood DrMay 20, 20254ton base upflow gas system · 165 m away
- 422 Parkhurst DrOct 28, 2026Rsvp-new single-family construction project · 169 m away
- 406 Kirkwood DrOct 9, 2026Nsfaa · 174 m away
- 438 Brookhurst DrSep 28, 2026Residential additional · 183 m away
- 417 Kirkwood DrMar 19, 2026Replacing 3 ton gas complete system · 186 m away
- 9744 Van Dyke RdNov 13, 2020Foundation repair · 193 m away
- 435 Parkhurst DrSep 24, 2025New construction plumbing · 200 m away
- 9719 Champa DrJan 7, 2021Permanent electrical service · 204 m away
- 9747 Van Dyke RdOct 22, 2020Foundation repair per engineering report · 227 m away