2322 Vagas St
Dallas, TX 75219
New duplex permitted at 2322–2324 Vagas St
Dallas permits indicate a new duplex is planned for 2322–2324 Vagas St. The new-construction permit was filed July 27, 2026, after a demolition permit filed June 24. Plumbing, electrical and HVAC permits followed between August and October 2026.
Summarized from City of Dallas records · updated Oct 12, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Oct 12, 2026
- since Jun 24, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsInstall all new electrical for duplex units a & b. install (2) 200 amp electrical services, new wiring, devices light fixtures
Install all new electrical for duplex units a & b. install (2) 200 amp electrical services, new wiring, devices light fixtures
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 2322 Vagas St
What is being built at 2322 Vagas St in Dallas?
City of Dallas records describe a new duplex at 2322–2324 Vagas St, with the two units separated by a two-hour fire-rated wall.
When was the duplex at 2322 Vagas St permitted?
The new-construction permit, RES-NEW-26-001289, was filed July 27, 2026.
Was a building demolished at 2322 Vagas St?
A City of Dallas demolition permit, RES-DEM-26-000541, was filed June 24, 2026.
What permits have been filed for 2322 Vagas St?
Records include demolition and new-construction permits, followed by plumbing, electrical and HVAC permits. The latest listed filing is the HVAC permit dated October 12, 2026.
When were plumbing and electrical permits filed for the duplex?
The plumbing permit was filed August 13, 2026, and the electrical permit was filed September 2, 2026.
What does the HVAC permit at 2322 Vagas St cover?
The October 12, 2026, mechanical permit, RES-MEC-26-005592, describes two 3-ton HVAC units.
Also being built nearby
All of 75219- 2330 Vagas StOct 12, 2026(2) 2 ton hvac system · 16 m away
- 2315 Vagas StSep 3, 2026Nsfaa remodel · 21 m away
- 2334 Vagas StMay 19, 2025Removal of all layers down to decking. a decking overlay will be necessary followed by a reroof · 25 m away
- 2335 Vagas StOct 19, 2020Demolition sfd · 28 m away
- 2343 Vagas StSep 29, 2020Install lawn sprinkler · 43 m away
- 2303 Vagas StJan 28, 2021Install lawn sprinkler · 44 m away
- 2345 Vagas StSep 29, 2020Install lawn sprinkler · 47 m away
- 2346 Vagas StNov 9, 20268 ft board on board fence - 145 ln ft 4ft board on board fence 35 ln ft · 49 m away
- 2301 Vagas StJan 28, 2021Install lawn sprinkler · 51 m away
- 2247 Vagas StOct 19, 2026Mcr it is a cinderblock, rebar and concrete retaining wall. it varies in height. you can see the location and specs on the attached site plan. which is designed and stamped by an engineer · 99 m away
- 2311 Douglas AveSep 4, 2025Install hvac complete system with ductwork · 105 m away
- 2239 Vagas StDec 1, 2025Demolition of structure and foundation · 106 m away