2825 Hood St
Dallas, TX 75219
Gas test and inspection permitted at 2825 Hood St
A residential plumbing permit for a gas test and inspection at 2825 Hood St was filed on September 14, 2026. The City of Dallas record does not specify any new construction or other project work.
Summarized from City of Dallas records · updated Sep 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 14, 2026
- since Sep 14, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2825 Hood St
What is being built at 2825 Hood St?
The City of Dallas record lists a gas test and inspection under residential plumbing permit RES-PLM-26-009733, filed September 14, 2026. It does not describe new construction.
What work was permitted at 2825 Hood St in Dallas?
The permit describes a gas test and inspection. It does not provide further details about the work.
When was the permit filed for 2825 Hood St?
The City of Dallas filed residential plumbing permit RES-PLM-26-009733 on September 14, 2026.
Is a new home being built at 2825 Hood St?
The available record does not indicate that a new home is being built. It lists a gas test and inspection.
What work is permitted near Clover Tower on Hood Street?
At 2825 Hood St, about 126 meters from Clover Tower at 2701 Hood Street, the City of Dallas record lists a gas test and inspection. The permit was filed September 14, 2026.
Also being built nearby
All of 75219- 2821 Hood StJun 23, 2026Direct bury whole home filtration system in backyard with rpz · 3 m away
- 2833 Hood StOct 14, 2026Water service · 6 m away
- 2811 Hood StJul 31, 20263-ton heat pump level 2 complete system replacement · 11 m away
- 2828 Hood StJun 9, 2026Hvac changeout/ alteration · 13 m away
- 3615 Gillespie StApr 20, 2026Replacing a 125 amp panel, grounding and surge protection · 63 m away
- 3611 Congress AveJan 22, 2021Tc-2020-27443 12/6/2020 to 8/7/2021 · 73 m away
- 3610 Gillespie StSep 14, 2020Remove existing roof and install new roof · 74 m away
- 2728 Hood StOct 12, 2026Install the client-provided ev charger and run two 40-amp single-phase circuits from the existing panel to the new dual-port level 2 ev charger · 100 m away
- 2721 Hood StJun 23, 2026Partial cast iron replacement up to slab approx 70 feet of new piping · 107 m away
- 3530 Gillespie StSep 25, 2026Replacing gas tankless water heater · 116 m away
- 2711 Hood StJul 28, 20252.5 ton system - downstair system · 117 m away
- 3528 Gillespie StOct 1, 20252 ton system replacement · 117 m away