3400 Welborn St
Dallas, TX 75219
Permits show apartment upgrades and plumbing repairs
Permits at 3400 Welborn St indicate plumbing repairs and interior upgrades at an existing apartment property, rather than a new building. The latest filing, dated November 18, 2026, covers replacement of the main domestic backflow device under permit COM-PLM-26-004426. An August 11, 2025 permit describes a renovation of a 1,200-square-foot unit.
Summarized from City of Dallas records · updated Nov 18, 2026
- Projects
- 15
- 15 filings
- Latest filing
- Nov 18, 2026
- since Nov 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
15 projectsReplacing existing can light with led. adding receptacle for refrigerator, adding 4 new can lights led and replacing vanity lights
Replacing existing can light with led. adding receptacle for refrigerator, adding 4 new can lights led and replacing vanity lights
City of Dallas permitCommercial Electrical PermitScope of work:1. demolition:• remove and dispose of existing kitchen cabinets, pantry, kitchen and vanity countertops, mirrors, bathtub, shower, tile flooring, and plumbing fixtures.2. cabinetry:• fabricate and install new shaker-style, paint-grade kitchen cabinets with a decorative tile backsplash. • total: 46 linear feet.3. countertops:• install new **level 4 vicostone** 3cm quartz countertops in kitchen and 1 bathroom.4. electrical:• replace existing can lights with new energy-efficient led fixtures.• add four (4) new can lights in the living room.• install new vanity light fixtures at bathroom vanities.• add electrical outlet for refrigerator.5. plumbing:• remove tub water supply and drain lines.• relocate water supply lines for new master shower layout.• install new plumbing fixtures for the shower and all three vanities.6. shower construction:• frame wing wall for new shower layout.• install schluter waterproofing system throughout shower area.• install 3/8" tempered glass shower door and fixed panel.• install new wall tile and custom shower pan.• grout and seal all tile work.7. flooring:• remove existing tile and install new flooring in kitchen and bathrooms. • estimated: 350 square feet.8. painting:• paint all interior walls of the 1,200 sq ft unit using sherwin-williams super paint. • color: to be determined.9. drywall repair:• repair and patch drywall where tile and mirrors were removed.• match existing wall texture for a seamless finish.10. carpentry:• customize two (2) walls with decorative wall paneling features.11. framing:• remove existing door and widen opening to accommodate new refrigerator insert in kitchen
Scope of work:1. demolition:• remove and dispose of existing kitchen cabinets, pantry, kitchen and vanity countertops, mirrors, bathtub, shower, tile flooring, and plumbing fixtures.2. cabinetry:• fabricate and install new shaker-style, paint-grade kitchen cabinets with a decorative tile backsplash. • total: 46 linear feet.3. countertops:• install new **level 4 vicostone** 3cm quartz countertops in kitchen and 1 bathroom.4. electrical:• replace existing can lights with new energy-efficient led fixtures.• add four (4) new can lights in the living room.• install new vanity light fixtures at bathroom vanities.• add electrical outlet for refrigerator.5. plumbing:• remove tub water supply and drain lines.• relocate water supply lines for new master shower layout.• install new plumbing fixtures for the shower and all three vanities.6. shower construction:• frame wing wall for new shower layout.• install schluter waterproofing system throughout shower area.• install 3/8" tempered glass shower door and fixed panel.• install new wall tile and custom shower pan.• grout and seal all tile work.7. flooring:• remove existing tile and install new flooring in kitchen and bathrooms. • estimated: 350 square feet.8. painting:• paint all interior walls of the 1,200 sq ft unit using sherwin-williams super paint. • color: to be determined.9. drywall repair:• repair and patch drywall where tile and mirrors were removed.• match existing wall texture for a seamless finish.10. carpentry:• customize two (2) walls with decorative wall paneling features.11. framing:• remove existing door and widen opening to accommodate new refrigerator insert in kitchen
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 3400 Welborn St
What is being built at 3400 Welborn St?
The permit records show repairs and interior upgrades at an existing property, not a new building. Recent work includes replacing a backflow device and remodeling an apartment unit.
What is the latest permit for 3400 Welborn St?
The latest filing is a commercial plumbing permit dated November 18, 2026. Permit COM-PLM-26-004426 covers replacement of the main domestic backflow device.
Is an apartment being remodeled at 3400 Welborn St?
A permit filed August 11, 2025 describes an interior remodel of a 1,200-square-foot unit. The work included kitchen and bathroom updates, lighting, flooring, and plumbing.
What plumbing work is permitted at 3400 Welborn St?
The latest plumbing permit covers replacement of the main domestic backflow device. Other records include water-heater replacements and plumbing work such as lavatories and a shower.
What work is happening at 3400 Welborn St near Gaedeke Group?
City of Dallas records for 3400 Welborn St show plumbing repairs and interior upgrades. The latest filing, dated November 18, 2026, is for replacing the main domestic backflow device.
When were permits filed for work at 3400 Welborn St?
The latest filing was November 18, 2026. Other recent permits include a residential electrical permit on October 19, 2026, and an apartment-unit alteration permit on August 11, 2025.
Also being built nearby
All of 75219- 3710 Rawlins St · Gaedeke GroupOct 28, 2026Mcr the scope of this project is a non-structural interior finish out in an existing single floor suite. scope includes hvac, electrical,, plumbing and cosmetic finishes · 26 m away
- 3401 Lee PkwyAug 18, 2026New shower and valve · 127 m away
- 3400 Oak Lawn AveMay 6, 2026Repair the main electrical line conduit damaged on existing 100 amp electrical service · 137 m away
- 3626 N Hall StDec 19, 2025This permit is to validate a space that did not exist in the city. no work done unless city deems needed · 145 m away
- 3333 Lee Parkway · Gpi Lee Parkway, LPJul 22, 2026Avison young — renovation/alteration — interior renovation of existing office space in high rise building · 149 m away
- 3333 Lee PkwySep 10, 2026Rough in and top out of new break sink · 149 m away
- 3625 North Hall Street 5th · Hall Street At The CentrumMay 10, 20245th floor spec suite, corr & restrooms — renovation/alteration — interior remote of office space, main corridor and restrooms · 156 m away
- 3625 North Hall Street · Hall St LtdAug 14, 2025Navigator — renovation/alteration — tenant improvement · 156 m away
- 3625 N Hall StJun 18, 2026Mcr add a demising wall to separate the suites, creating suite 550 and making the square footage of suite 525 now 1,797 usf.a separate permit has been submitted for the demising wall on the other side of suite 525 separating suites 500 & 525.com-alt-add-26-000913 · 156 m away
- 3303 Lee PkwyOct 2, 2026Commercial interior remodel · 167 m away
- 3421 Oak Lawn AveMay 18, 2026Install new 2 inch electrical conduit for replacement wayfinding kiosk construction · 177 m away
- 3403 Oak Lawn AveSep 16, 2026Mechanically attach two layers of 2.6 poli iso insulation to achieve a r30 insulation rating mechanically attach a new 60 mil rubber carlisle tpo roof in strict accordance to manufacters plans and specifications flash in all ac curbs pipes and flashing in accordance to factory specifications install two new drains and remove and replace coping cap with new kynar prefinished 24 gauge metal · 191 m away