3888 Oak Lawn Ave
Dallas, TX 75219
Gas line inspection permit at 3888 Oak Lawn Ave
A commercial plumbing permit at 3888 Oak Lawn Ave covers a gas line inspection to allow service restoration. The City of Dallas record was filed on November 19, 2025, under permit COM-PLM-25-002619.
Summarized from City of Dallas records · updated Nov 19, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 19, 2025
- since Nov 19, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3888 Oak Lawn Ave
What is happening at 3888 Oak Lawn Ave?
A City of Dallas commercial plumbing permit covers a gas line inspection to allow service restoration. The record does not describe a new building or other construction.
What work does permit COM-PLM-25-002619 cover?
The permit description says the work is a gas line inspection to allow service restoration. It was filed on November 19, 2025.
When was the permit filed for 3888 Oak Lawn Ave?
The City of Dallas permit was filed on November 19, 2025.
Is a new building planned at 3888 Oak Lawn Ave?
The available record documents a gas line inspection for service restoration, not a new building. It does not provide details about any other plans for the address.
What is happening near Versant Capital Management at 3838 Oak Lawn?
At nearby 3888 Oak Lawn Ave, a City of Dallas commercial plumbing permit covers a gas line inspection to allow service restoration. The permit was filed on November 19, 2025.
Also being built nearby
All of 75219- 3878 Oak Lawn Ave · C302 Investment Group LLCMar 25, 2024Cream & crepes dallas — renovation/alteration — interior renovation · 17 m away
- 4317 Irving AveOct 3, 2025Sewer line yard service 3"at the single cleanout 4" clay piping pvc and clay 3' deep at sewer tap right side of home running across the front yard · 38 m away
- 3858 Oak Lawn AveApr 24, 2026Mcr for suite 400 and created suite 4033,239 sq ft - low scope modification of an existing lenscrafters tenant space to conform to texas optometry law, stat. sec. 351.364 that requires a solid partition separating the space occupied by the optometrist (the doctor, the business side) and the therapeutic optometrist (the retail sales, the mercantile side) from each other. the overall space is one tenant, one business entity and there is only one lease with the landlord. it is the intent of the client that this work will be done as an open remodel so as to allow this tenant space to remain open for business. · new interior partition walls · new wall, ceiling & floor finishes · electrical work for modified switch locations and od room fixtures · relocation of existing drinking fountain · 50 m away
- 4339 Irving AveJan 15, 2026Gas line in yard and partial under house · 66 m away
- 3848 Oak Lawn AveNov 13, 2020Service release no work · 66 m away
- 4344 Irving BlvdOct 29, 2026Service no work · 70 m away
- 3838 Oak Lawn Ave · Turtle Creek VillageAug 23, 2026Install breakroom sink · 83 m away
- 3838 Oak Lawn · Dlv Tc Village LPJul 16, 2026Versant capital management expansion — renovation/alteration — tenant improvement · 83 m away
- 3838 Oak Lawn AveMar 7, 2026Remodel of electrical in suite 200 · 83 m away
- 3830 Oak Lawn AveFeb 24, 2026Mcr 3,239 sq ft - low scope modification of an existing lenscrafters tenant space to conform to texas optometry law, stat. sec. 351.364 that requires a solid partition separating the space occupied by the optometrist (the doctor, the business side) and the therapeutic optometrist (the retail sales, the mercantile side) from each other. the overall space is one tenant, one business entity and there is only one lease with the landlord. it is the intent of the client that this work will be done as an open remodel so as to allow this tenant space to remain open for business. · new interior partition walls· new wall, ceiling & floor finishes· electrical work for modified switch locations and od room fixtures· relocation of existing drinking fountain · 96 m away
- 4251 Irving AveJul 9, 202619th floor meter stack replacement* coordinate with building management to shut down main distribution breaker serving floors 17–20* expect temporary power outage to floors 17–20 for approximately 5–6 hours during repair work* access 19th floor electrical room and verify all circuits are de-energized prior to work* remove and demolition existing damaged meter stack* furnish and install (1) new square d 4-gang, 800a meter stack* reuse existing branch wiring, feeders, and main breakers* reinstall and secure all existing tenant breakers as applicable* restore power at main distribution breaker once installation is complete · 115 m away
- 4242 Irving Blvd · Abf Freight System INCOct 30, 2026Qteam inhouse interior tenant remodel. existing. no change in tenant nor use · 128 m away