4110 Prescott Ave
Dallas, TX 75219
Gas systems to be replaced at 4110 Prescott Ave
A Dallas permit filed March 31, 2026, covers replacing a 2-ton gas system and a 3-ton gas system at 4110 Prescott Ave. An earlier permit, filed September 18, 2020, covered gas relay or repair work with a test.
Summarized from City of Dallas records · updated Mar 31, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Mar 31, 2026
- since Sep 18, 2020
- Largest scope
- —
- Listed value
- $1
- partial · often understated
Permit & project history
4 projectsSources: City of Dallas
Questions about 4110 Prescott Ave
What is happening at 4110 Prescott Ave?
A permit filed March 31, 2026, covers replacing a 2-ton gas system and a 3-ton gas system.
When was the gas system replacement permitted at 4110 Prescott Ave?
The City of Dallas permit was filed March 31, 2026. Its permit number is RES-MEC-26-001423.
What size gas systems are being replaced at 4110 Prescott Ave?
The permit description lists a 2-ton gas system and a 3-ton gas system.
Was there earlier work at 4110 Prescott Ave?
Yes. A City of Dallas permit filed September 18, 2020, records gas relay or repair work with a test. The permit number is 2009186010.
Is a new building being built at 4110 Prescott Ave?
The two listed City of Dallas records describe gas system replacement and gas relay or repair work; neither describes construction of a new building.
Also being built nearby
All of 75219- 4118 Prescott AveJun 3, 2026Shut off valve · 18 m away
- 4120 Prescott AveAug 24, 2026Installing (6) hvac systems, (4) 5-ton, (2) 3.5-ton duplex · 22 m away
- 4128 Prescott AveAug 18, 2026New hvac install · 40 m away
- 4130 Prescott AveAug 18, 2026New hvac install · 44 m away
- 4358 Douglas AveFeb 4, 2026Up to 25 · 47 m away
- 4134 Prescott AveOct 28, 2020Gas relay or repair with test · 53 m away
- 4149 Prescott AveOct 22, 2025Disconnect replacement: furnish & install (8) 100a, 2-pole, nema 3r fusible service-rated disconnects with 60a class r fuses. includes hardware, labels, and termination of existing conductorsgrounding electrode system: install (2) 5/8" × 8' copper ground rods, #6 cu bond, water pipe bond, and grounding bus bar. includes clamps, lugs, and hardware · 85 m away
- 4152 Prescott AveAug 6, 2025Relocate 4 gas lines from interior closet to new atmos meter located outside · 93 m away
- 4154 Prescott AveAug 6, 2025Relocate 4 gas lines from interior closet to new atmos meter located outside · 97 m away
- 4049 Prescott AveOct 20, 2025Gas test · 99 m away
- 4111 Herschel AveNov 11, 2026Meter repair notes : replace bad socket · 100 m away
- 4115 Herschel AveOct 31, 2025Gas test for gas release · 100 m away