4230 Wycliff Ave
Dallas, TX 75219
4230 Wycliff Ave: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 4230 Wycliff Ave, Dallas, TX 75219. The most recent, filed January 6, 2021, covers: “Replace or modify existing hvac”.
Compiled from City of Dallas records · updated Jan 6, 2021
- Projects
- 2
- 2 filings
- Latest filing
- Jan 6, 2021
- since Jan 6, 2021
- Largest scope
- —
- Listed value
- $145
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 4230 Wycliff Ave
What is being built at 4230 Wycliff Ave?
The latest filing (City of Dallas permit 2101063036, January 6, 2021) covers replace or modify existing hvac.
How many permits and filings does 4230 Wycliff Ave have?
2 filings across 2 projects, from January 6, 2021 to January 6, 2021.
How much is the construction at 4230 Wycliff Ave worth?
Permits at this address list about $145 in valuations. Permit valuations are often partial and understate total project cost.
What is being built near Pnc Bank, N.a. in Dallas?
4230 Wycliff Ave is about 131 m from Pnc Bank, N.a. (4201 Oak Lawn Ave). Its latest filing is for replace or modify existing hvac.
Is there other construction near 4230 Wycliff Ave?
Yes. Nearby filings include 4232 Wycliff Ave (replace or modify existing hvac, Jan 19, 2021); 4236 Wycliff Ave (we are replacing one 7.5 ton rooftop unit for like to like tonnage. we are not replacing any electrical or ductwork, Nov 20, 2025); 4218 Wycliff Ave (install water heater, Dec 22, 2020).
How do I get alerts for new permits at 4230 Wycliff Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75219- 4232 Wycliff AveJan 19, 2021Replace or modify existing hvac · 4 m away
- 4236 Wycliff AveNov 20, 2025We are replacing one 7.5 ton rooftop unit for like to like tonnage. we are not replacing any electrical or ductwork · 11 m away
- 4218 Wycliff AveDec 22, 2020Install water heater · 23 m away
- 4213 Wycliff AveAug 1, 2025Replace 4 ton complete · 37 m away
- 4219 Throckmorton StOct 26, 2020Replace or modify existing hvac · 77 m away
- 4119 Throckmorton StJan 14, 2026Gas pressure test · 113 m away
- 4222 Newton AveAug 6, 2026Gas test · 122 m away
- 4215 Herschel AveNov 18, 2026New generator radiator exhaust routing from east side to north side at alley via basement garage by building cmu wall. modification to existing routing and other affected systems in building · 127 m away
- 4201 Oak Lawn Ave · Pnc Bank, N.a.May 1, 2024Pnc bank ada remediation design - oak lawn — renovation/alteration — the improvements intend to bring the exterior accessible parking/access aisle and pedestrian paths into compliance with current ada standards. scope includes 5,140 sq ft of asphalt, concrete and landscaping improvements · 131 m away
- 4217 Oak Lawn AveOct 9, 2020Build wood deck for covid restrictions · 134 m away
- 4225 Oak Lawn AveDec 11, 2025Gas test and inspection · 136 m away
- 4300 Throckmorton StJun 2, 2025Replace 2nd floor hvac · 137 m away