1 Justice Way
Dallas, TX 75220
Office renovation and parking-area upgrades at 1 Justice Way
A commercial alteration permit filed September 24, 2025, covers renovations to a GSA tenant space at 1 Justice Way. The work includes reconfiguring a server room, modifying a garage door for a mobile command unit, changing office layouts, and making parking-area and perimeter improvements.
Summarized from City of Dallas records · updated Sep 24, 2025
- Projects
- 8
- 8 filings
- Latest filing
- Sep 24, 2025
- since Sep 28, 2020
- Largest scope
- —
- Listed value
- $430K
- partial · often understated
Permit & project history
8 projectsMcr the proposed work is a ti renovation for this gsa tenant space. server room reconfiguration: following the installation of the ups (uninterrupted power supply) by the fbi, reconfigure the server room. reconfiguration involves replacing the ramp, handrails and adding a step. et garage door: adjust the et bay door height, provide a new door with motor, internet access, and provide shore power to accommodate the mobile command unit (mcu). scif door relocation and decertification of entryway office space: dallas 4th floor scif relocate the main entryway door and hirsch pad by pushing them back approximately 10-20 feet. decertify office by removing the alarm system, certifying the presence of foil for the newly established perimeter, securing ducts and openings, repairing cracks, gaps, and holes throughout the perimeter ceiling and painting walls deck to deck. add exterior lighting poles to the rear yardcreate a perimeter path at the rear yard along the fence lineperimeter fence repairsretrofit water fountains with goosenecksreplace existing vct at specified locationselectrical infrastructure: add electrical infrastructure to support the at&t booster in the parking garage on the 3rd floor. set a 75kva transformer, power out of the 480v panel, add a disconnect and power the transformer. nurses office hvac: independent coolingexecutive management offices: create (4) offices by splitting the (2) executive management offices in half. install doors, frames, and hardware for each office.telephone room hvac: independent coolingsac restroom: finish refresh of sac restroom on the 5th floor
Mcr the proposed work is a ti renovation for this gsa tenant space. server room reconfiguration: following the installation of the ups (uninterrupted power supply) by the fbi, reconfigure the server room. reconfiguration involves replacing the ramp, handrails and adding a step. et garage door: adjust the et bay door height, provide a new door with motor, internet access, and provide shore power to accommodate the mobile command unit (mcu). scif door relocation and decertification of entryway office space: dallas 4th floor scif relocate the main entryway door and hirsch pad by pushing them back approximately 10-20 feet. decertify office by removing the alarm system, certifying the presence of foil for the newly established perimeter, securing ducts and openings, repairing cracks, gaps, and holes throughout the perimeter ceiling and painting walls deck to deck. add exterior lighting poles to the rear yardcreate a perimeter path at the rear yard along the fence lineperimeter fence repairsretrofit water fountains with goosenecksreplace existing vct at specified locationselectrical infrastructure: add electrical infrastructure to support the at&t booster in the parking garage on the 3rd floor. set a 75kva transformer, power out of the 480v panel, add a disconnect and power the transformer. nurses office hvac: independent coolingexecutive management offices: create (4) offices by splitting the (2) executive management offices in half. install doors, frames, and hardware for each office.telephone room hvac: independent coolingsac restroom: finish refresh of sac restroom on the 5th floor
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 1 Justice Way
What is being built at 1 Justice Way in Dallas?
A City of Dallas permit indicates renovations to a GSA tenant space, including server-room changes, office alterations, and parking-area upgrades. The permit was filed September 24, 2025.
What work is planned at 1 Justice Way?
Permit COM-ALT-ADD-25-001279 lists server-room reconfiguration, a modified garage door and shore power for a mobile command unit, changes to a secure entryway, and other interior and exterior improvements.
Is a new building going up at 1 Justice Way?
The record is for a commercial alteration and addition permit describing tenant-space renovations, not a new building.
What parking-area work is planned at 1 Justice Way?
The permit includes a garage-door adjustment and electrical infrastructure in the parking garage, along with exterior lighting poles, a perimeter path, and fence repairs in the rear yard.
What office changes are planned at 1 Justice Way?
The permit describes splitting two executive management offices into four and relocating a secure entryway door. It also lists independent cooling for a nurses' office and telephone room.
What's being renovated near Octapharma Plasma on Stemmons Trail?
At 1 Justice Way, about 440 meters from the listed Octapharma Plasma remodel, a permit covers renovations to a GSA tenant space and improvements to the parking area and rear yard.
Also being built nearby
All of 75220- 7 Justice Way · Trefcm Jw Owner LLCFeb 3, 2026Gas test for building · 40 m away
- 2320 Stemmons Trail · Double Run LPSep 8, 2026Octapharma plasma - dallas remodel — renovation/alteration — interior remodel to an existing business · 440 m away
- 2320 Stemmons TrlSep 22, 2026Mcr interior remodel to an existing business including interior demolition, modification to existing electrical, plumbing, hvac, new partitions, and finishes · 440 m away
- 10105 Technology Blvd WOct 15, 2026Installing backflow · 515 m away
- 2363 Stemmons TrlDec 16, 2025Installing two 20 amp circuits for sliding gate · 563 m away
- 1550 Storey LnJan 12, 2026Electrical no work · 567 m away
- 1632 Storey LnSep 22, 2026Replace a pipe from outside behind the wall to roof. it had a leak. replacing 150 ft of pipe · 571 m away
- 9999 Technology Blvd WOct 15, 2025Removal of 76,560 sq ft concrete foundation.building was demolished last year · 572 m away