10015 Technology Blvd W
Dallas, TX 75220
Roof work and backflow installation at 10015 Technology Blvd W
City of Dallas permits show roof improvements at 10015 Technology Blvd W, filed July 24, 2025, and backflow installation, filed October 15, 2026. The roofing permit describes adding insulation and a TPO membrane over the existing roof, with no tear-off or change to the roof pitch.
Summarized from City of Dallas records · updated Oct 15, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Oct 15, 2026
- since Jul 24, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsMechanically attache 1/2" polyiso insulation and.60mil tpo-single ply membrane over existing modified bitumen roof (1 layer). no tear off, no change to pitch
Mechanically attache 1/2" polyiso insulation and.60mil tpo-single ply membrane over existing modified bitumen roof (1 layer). no tear off, no change to pitch
City of Dallas permitCommercial Roofing Permit
Sources: City of Dallas
Questions about 10015 Technology Blvd W
What is being built at 10015 Technology Blvd W?
The records show roof work and backflow installation, not a new building. The roofing permit was filed July 24, 2025, and the backflow permit was filed October 15, 2026.
What roof work is planned at 10015 Technology Blvd W?
Permit COM-ROOF-25-000069 describes installing insulation and a TPO membrane over the existing roof. It specifies no tear-off and no change to the roof pitch.
What is the latest permit for 10015 Technology Blvd W?
The latest listed permit is COM-PLM-26-003817, filed October 15, 2026, for installing backflow.
Is a new building going up at 10015 Technology Blvd W?
The two listed City of Dallas permits are for roofing and backflow installation. They do not describe new construction.
What work is happening near Technology Warehouse on Technology Boulevard?
At 10015 Technology Blvd W, about 424 meters from Technology Warehouse, permits show roof improvements and backflow installation. The roofing permit was filed July 24, 2025, and the backflow permit was filed October 15, 2026.
Also being built nearby
All of 75220- 2213 Connector DrAug 11, 2026Replace 3" backflow · 214 m away
- 10025 Technology Blvd WNov 16, 2026Installing backflow device · 267 m away
- 10005 Technology Blvd WNov 17, 2026Installing backflow devise · 284 m away
- 2250 Connector DrMar 1, 20242250 connector drive. a project with 11 apartment buildings, a clubhouse, and a cabana · 289 m away
- 2250 Connector Drive · Ldg The Park At Northpoint, LPJan 19, 2024The park at northpoint — new construction — this is the clubhouse and leasing center for a new 426 unit multifamily community in dallas, texas · 289 m away
- 2250 Connector DrAug 18, 2026Addendum to permit 2401291163 · 289 m away
- 9999 Technology Blvd WOct 15, 2025Removal of 76,560 sq ft concrete foundation.building was demolished last year · 400 m away
- 10150 Technology Blvd EJul 8, 2026Architectural drawings for adding security monitors at security desk architectural drawings for replacement of existing secuirty desk with new architectural drawings for removal and/ or replacement of existing finishes in the labortories (removal of vct replace with sealed concrete) electrical drawings for security device support electrical drawings for for entry rreceptionist desk · 420 m away
- 10110 Technology Blvd · Cantex Technology, LLCMay 14, 2026Technology warehouse — new construction — ground up new construction of an office & warehouse space · 424 m away
- 10110 Technology Blvd East · Social Church INCJun 11, 2026Social dallas — renovation/alteration — 111,840 sq ft exterior facade renovation, new 2300 (approximate) seat auditorium, classrooms, auxiliary theaters, lobby, cafe, and support space · 424 m away
- 10110 Technology Blvd EJun 15, 2026Qteam inhouse make ready/ demolition permit only - selective demolition of interior existing conditions. (walls, floors, ceilings, seating, risers) · 424 m away
- 10106 Technology Blvd WSep 18, 2026R/r shingles approximately 2300 squares · 425 m away