2221 Manana Dr
Dallas, TX 75220
Office suites 130 and 140 are being combined at 2221 Manana Dr
Dallas permits indicate that office suites 130 and 140 at 2221 Manana Dr are being combined into one suite. The interior alteration permit was filed April 17, 2026, followed by permits for HVAC work and office demolition. Later plumbing permits in June and July covered gas service testing, and electrical permits were filed in August.
Summarized from City of Dallas records · updated Aug 14, 2026
- Projects
- 15
- 15 filings
- Latest filing
- Aug 14, 2026
- since Nov 6, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
15 projectsGas pressure test to restore service for tenant after suite 140 expanded to take over suite 130 into one suite
Gas pressure test to restore service for tenant after suite 140 expanded to take over suite 130 into one suite
City of Dallas permitCommercial Plumbing PermitMisc. office demolition, table existing services, re switch lighting as needed, relocate lighting as needed
Misc. office demolition, table existing services, re switch lighting as needed, relocate lighting as needed
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 2221 Manana Dr
What is being built at 2221 Manana Dr in Dallas?
Permits indicate an interior office alteration combining suites 130 and 140 into one suite. The alteration permit, COM-ALT-ADD-26-000770, was filed April 17, 2026.
Is a new office building going up at 2221 Manana Dr?
The records show interior office work, including combining two suites, HVAC installation and office demolition. They do not indicate a new building.
When was the work at 2221 Manana Dr permitted?
The suite-combination alteration permit was filed April 17, 2026. Related permits were filed from April through August 2026.
What do the permits say about suites 130 and 140 at 2221 Manana Dr?
The permit description says suite 140 expanded to take over suite 130, combining them into one suite. Plumbing permits filed July 16 and July 23, 2026, covered gas pressure testing after the combination.
Was office demolition permitted at 2221 Manana Dr?
Yes. A Dallas electrical permit filed April 30, 2026, describes miscellaneous office demolition and adjustments to existing services and lighting.
What other work is permitted at 2221 Manana Dr?
A commercial mechanical permit filed April 21, 2026, describes HVAC installation. Electrical permits filed August 3 and August 14, 2026, are described as “Clean & show.”
Also being built nearby
All of 75220- 2242 Manana DrDec 15, 2020Installing a fire alarm celluar communicator · 80 m away
- 2329 Manana DrFeb 24, 2026Electrical service for lot that will be used for parking commercial vehicles. power is needed for power tools and keeping the lot clean · 82 m away
- 2202 Manana DrApr 29, 2026Electrical release. no work. suite 224 · 83 m away
- 2250 Manana DrApr 15, 2026New electrical service for food truck park outside of building · 112 m away
- 2270 Manana DrAug 4, 2026Bu zo intake permit for existing second story addition to office. related to co-26-002788 please see wilber williams for plan review · 222 m away
- 10705 Newkirk StApr 1, 2026Replace service disconnect. 250v 200a · 269 m away
- 10661 Newkirk St · Carter Group Investment LLCJun 17, 2024Motor control inc. — renovation/alteration — motor control panel company · 370 m away
- 10900 Goodnight LnJan 2, 2026Gas test and repair if necessary · 405 m away
- 10630 Newkirk StDec 16, 2025Clean & show only · 437 m away
- 10625 Newkirk StOct 6, 2026Electrical service release / no work. power restore for commercial suite at 10625 newkirk st suite 200. no electrical work will be performed · 455 m away
- 10709 Goodnight LnOct 19, 2026Remodel permit required per request of co-26-003700 · 464 m away
- 10615 Newkirk StMar 20, 2026We are wanting to get electrical services switched back into the landlord's name. however, the tenant turned off electric services before we could switch them, prompting oncor to require an inspection by the city · 478 m away