2904 W Northwest Hwy
Dallas, TX 75220 · Northwest Park Center, LLC
Carniceria Prime meat market planned at 2904 W Northwest Hwy
A renovation of two existing suites into a 2,254-square-foot meat market was registered for Carniceria Prime on November 21, 2025. Dallas permits filed through May 29, 2026, cover suite combination, plumbing, electrical and HVAC work, and a vapor-only vent hood.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated May 29, 2026
- Projects
- 7
- 7 filings
- Latest filing
- May 29, 2026
- since Nov 21, 2025
- Largest scope
- 2,254 sf
- Estimated cost
- $300K
- state registration
Permit & project history
7 projectsInstall -6” can lightsinstall -new disconnect install - 400 amp service install -2 -200 amp service
Install -6” can lightsinstall -new disconnect install - 400 amp service install -2 -200 amp service
City of Dallas permitCommercial Electrical PermitPlumbing remodel-install 500 gal. grease trap-sinks-floor drains-water heater-rpz-gas lines-rest rooms
Plumbing remodel-install 500 gal. grease trap-sinks-floor drains-water heater-rpz-gas lines-rest rooms
City of Dallas permitCommercial Plumbing PermitRenovation of two existing suites into a meat market. building is not sprinklered. new single occupancy toilet will be created and multiple handwash stations. — northwest park center
TDLR project registrationRenovation/AlterationReview Complete2,254 sq ft$300K est.- Project #
- TABS2026006575
- Tenant / owner
- Carniceria Prime
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 2904 W Northwest Hwy
What is being built at 2904 W Northwest Hwy?
A TDLR registration describes a renovation of two existing suites into a meat market for Carniceria Prime. The project is listed at 2,254 square feet.
Is Carniceria Prime opening at 2904 W Northwest Hwy?
The project registration identifies Carniceria Prime and describes plans for a meat market. The records do not give an opening date.
When was the meat market project permitted?
The TDLR project registration was filed November 21, 2025. Dallas permit records continued through May 29, 2026, when permit COM-MEC-26-001300 was filed for a vapor-only vent hood.
What work is planned at 2904 W Northwest Hwy?
Records describe combining two suites and installing plumbing, electrical and HVAC improvements. The plumbing permit, COM-PLM-26-000125, includes a grease trap, sinks, floor drains, a water heater, gas lines and restrooms.
How large is the Carniceria Prime project in Dallas?
The TDLR registration lists the renovation as 2,254 square feet. Its $300,000 figure is the applicant's estimated project cost.
Will the meat market have a sprinkler system?
The TDLR description says the building is not sprinklered. The registration also describes a new single-occupancy toilet and multiple handwash stations.
Also being built nearby
All of 75220- 2912 W Northwest HwyJul 9, 2026Service meter socket and mast replacement:replace the vandalized electrical service equipment by installing a new meter socket and service mast while reusing the existing 200-amp disconnect · 11 m away
- 2920 W Northwest HwyOct 26, 2020Erect attached sign · 22 m away
- 2950 W Northwest HwySep 17, 2026Install new lighting · 63 m away
- 2829 W Northwest HwyAug 28, 2026Zo bc this project consists of the remodel and addition of el pulpo king restaurant.the scope of work includes the interior remodel of the existing 7,739-square-foot restaurant, including architectural, mechanical, electrical, and plumbing improvements necessary for restaurant operations. the estimated cost of the remodel was $25,000the project also includes a new 758-square-foot covered porch addition. the estimated cost of the addition of the same $25,000total project area: 8,497 square feet.total estimated construction cost: $25,000 · 105 m away
- 9720 Starlight RdOct 28, 2026Gas test · 130 m away
- 2804 W Northwest HwyDec 14, 2020Interior remodel only · 135 m away
- 2807 West Northwest Hwy · Racetrac Inc.Aug 13, 2025Racetrac#2337 community — renovation/alteration — modify existing equipment line to incorporate new grab-n-go offer, remove equipment & relocate equipment throughout sales floor · 134 m away
- 2807 W Northwest HwyMay 15, 2026The project scope involves a limited interior renovation consisting in the modification of the existing equipment line to incorporate a new grab-n-go food offer. some existing equipment will be removed and some relocated throughout the sales floor area, affecting approximately 3181 sq ft · 134 m away
- 2829 Webb Chapel Extension ExtFeb 24, 2026Gas line repair and gas line testing for release to atmos.this is for super wash and dry at suite number 101 · 139 m away
- 2829 Webb Chapel ExtFeb 16, 2026Small gas leak repair and gas test for release to atmos · 139 m away
- 3004 W Northwest HwySep 16, 2026Interior/exterior remodel adding new doors openings · 166 m away
- 2905 Webb Chapel ExtDec 16, 2025We have existing co we need electrical release only no work is being done -- electrical release only, no work authorized under this permit · 189 m away