3729 Park Ln
Dallas, TX 75220
New single-family home permitted at 3729 Park Ln
City of Dallas records show a house demolition permit filed December 12, 2025, followed by a permit for new single-family home construction on January 26, 2026. Electrical, plumbing and HVAC permits for the new home were filed between February and April 2026.
Summarized from City of Dallas records · updated Apr 17, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Apr 17, 2026
- since Dec 12, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsSources: City of Dallas
Questions about 3729 Park Ln
What is being built at 3729 Park Ln?
City permits indicate a new single-family home is being built after a house demolition permit was filed for the address.
Was a house demolished at 3729 Park Ln?
A residential demolition permit, RES-DEM-25-000715, was filed December 12, 2025, with the description “Demolition house.”
When was the new home at 3729 Park Ln permitted?
The City of Dallas filed residential new construction permit RES-NEW-25-001430 on January 26, 2026.
Are there permits for electrical, plumbing and HVAC work at 3729 Park Ln?
Yes. Electrical permit RES-ELC-26-001034 was filed February 22, 2026, plumbing permit RES-PLM-26-001975 on February 20, 2026, and HVAC permit RES-MEC-26-001761 on April 17, 2026.
Is the new home at 3729 Park Ln complete?
The records provided show construction and related trade permits, but do not state whether the home is complete.
Also being built nearby
All of 75220- 3732 Park LnOct 19, 2026Install hvac · 18 m away
- 3739 Park LnMay 23, 20258ft cedar wood fence board on board horizontal metal post and two single gates · 33 m away
- 3719 Park LnAug 1, 2025Shower replacement · 34 m away
- 3738 Park LnOct 21, 2025Gas line to pool heater · 36 m away
- 3715 Park LnMay 4, 2026Water line installation (30 feet), sewer line installation (40 feet), water heater installation, fireplace and range connections, gas line installation (50 feet) · 47 m away
- 3708 Park LnOct 8, 2026Demolition existing structure \| 3708 park lane · 68 m away
- 3728 Matador DrApr 1, 2026Move existing gas line · 88 m away
- 3732 Matador DrMar 16, 2026Two complete hvac replacements · 89 m away
- 3722 Matador DrNov 6, 202615 combination hybrid pier4 exterior concrete brakout and repatch 2x2 · 91 m away
- 3738 Matador DrNov 9, 2026Electrical for new construction · 94 m away
- 3714 Matador DrNov 5, 2020Remove existing roof and install new roof · 100 m away
- 3729 Matador DrNov 14, 20253729 matador install 59 concrete pilings to stabilize foundation · 101 m away