3756 Seguin Dr
Dallas, TX 75220
Permit filed for a vehicle-to-home charging system
A residential electrical permit filed July 17, 2026, describes installation of a GM Energy V2H bidirectional charging system at 3756 Seguin Dr. The permit says the system can charge the vehicle from the grid and, during a grid outage, use the vehicle battery to power certain backed-up loads at the house.
Summarized from City of Dallas records · updated Jul 17, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 17, 2026
- since Jul 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectWe are installing a gm (general motors) energy v2h (vehicle to home) system. this bidirectional charging system allows the vehicle to charge from the grid under normal circumstances. when the grid is down, the roles reverse, and the electric vehicle's battery becomes the power source for certain backed up loads at the house
We are installing a gm (general motors) energy v2h (vehicle to home) system. this bidirectional charging system allows the vehicle to charge from the grid under normal circumstances. when the grid is down, the roles reverse, and the electric vehicle's battery becomes the power source for certain backed up loads at the house
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 3756 Seguin Dr
What is being installed at 3756 Seguin Dr?
A City of Dallas residential electrical permit describes installation of a GM Energy V2H vehicle-to-home system. The permit was filed July 17, 2026.
What does a vehicle-to-home charging system do?
According to permit RES-ELC-26-004257, the system charges the vehicle from the grid under normal conditions. During a grid outage, the vehicle battery can supply power to certain backed-up loads at the house.
When was the permit filed for 3756 Seguin Dr?
The City of Dallas filed residential electrical permit RES-ELC-26-004257 on July 17, 2026.
Is a new house being built at 3756 Seguin Dr?
The available record describes installation of a vehicle-to-home charging system, not construction of a new house.
Will the system provide backup power during an outage?
The permit says the vehicle battery can become the power source for certain backed-up loads when the grid is down. It does not specify which loads.
Also being built nearby
All of 75220- 3772 Seguin DrJul 7, 20253772 seguin install 6 concrete pilings to stabilize foundation · 47 m away
- 3773 Seguin DrJul 22, 2026Mcr pool/spa · 49 m away
- 3742 Seguin DrJul 1, 2026Complete hvac system with ductwork · 50 m away
- 3741 Seguin DrSep 9, 2026Constructing a fence of black metal at six feet height · 59 m away
- 3741 Seguin DrMar 30, 2026New wood fence 8' tall board on board · 59 m away
- 3753 Valley Ridge RdJun 11, 20258 ft privacy fenceaprox 84' lft- 8' cedar fence stain / steel post1x6 boards / 2x4 rails / 1x4 trim/ 2x6 kickboard · 96 m away
- 3743 Juniper DrSep 22, 2025Installing 50 ft of water line from the water meter to the house · 103 m away
- 3762 Valley Ridge RdOct 25, 2026New construction plumbing · 103 m away
- 9963 Mixon DrApr 22, 2026New hvac · 115 m away
- 3759 Juniper DrJan 6, 2021Install swimming pool · 116 m away
- 3725 Seguin DrSep 12, 2025Add ductwork · 119 m away
- 9974 Mixon DrMay 4, 2026Add pool gas · 128 m away