3804 Eaton Dr
Dallas, TX 75220
Residential EV charger permitted at 3804 Eaton Dr
A private residential EV charger was permitted at 3804 Eaton Dr on November 4, 2025. The City of Dallas permit describes connecting it to an existing 60-amp subpanel with a dedicated 50-amp, two-pole breaker.
Summarized from City of Dallas records · updated Nov 4, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Nov 4, 2025
- since Nov 4, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsPrivate residential ev charger tied into existing 60a sub panel on dedicated 50a-2p breaker. #6 cu conductors, #10 cu ground, and 3/4" emt or equivalent raceway
Private residential ev charger tied into existing 60a sub panel on dedicated 50a-2p breaker. #6 cu conductors, #10 cu ground, and 3/4" emt or equivalent raceway
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 3804 Eaton Dr
What is being installed at 3804 Eaton Dr?
A City of Dallas residential electrical permit indicates a private EV charger is being installed at the address.
When was the EV charger permit filed at 3804 Eaton Dr?
The permit was filed on November 4, 2025.
What is the permit number for 3804 Eaton Dr?
The EV charger permit number is RES-ELC-25-004252.
Is 3804 Eaton Dr getting a public EV charging station?
The permit describes a private residential EV charger, not a public charging station.
How will the EV charger at 3804 Eaton Dr be connected?
The permit describes connecting it to an existing 60-amp subpanel on a dedicated 50-amp, two-pole breaker.
Also being built nearby
All of 75220- 3805 Eaton DrOct 27, 2020Construct new sfd · 13 m away
- 3814 Eaton DrNov 19, 2025Gas line to firepit · 22 m away
- 3819 Eaton DrNov 14, 2025Install 8ft fence board on board with flat top trim and kick board · 33 m away
- 3842 Eaton DrOct 3, 2025Install full hvac ductwork · 84 m away
- 3825 Hawick LnDec 11, 2025Gas test · 99 m away
- 3829 Hawick LnJul 7, 2025Electrical for swimming pool · 100 m away
- 3771 Almazan DrNov 23, 2020Install swimming pool · 101 m away
- 3849 Hawick LnDec 8, 2025Install new fence · 115 m away
- 9401 Mixon DrMay 19, 2026735 sq ft subfloor replacement/reinforcement77 ft lineal feet of sill plate77 ft lineal feet of rim joist105 ft lineal feet of floor joist560 ft lineal feet of floor joist · 126 m away
- 3852 Hawick LnOct 8, 2026New hvac and ventilation install · 130 m away
- 3753 Almazan DrOct 25, 2026New hvac · 152 m away
- 3811 Lenel DrNov 16, 2026Contractor shall furnish all necessary labor, materials, tools, and equipment to replace approximately 65 linear feet of existing gas piping throughout the property.the work shall include the following:1. remove and replace approximately 65 feet of existing gas piping using a combination of new black iron steel piping and approved csst (corrugated stainless steel tubing), as required for the installation.2. install new black iron steel gas piping in designated areas underneath the home and along the exterior wall of the residence.3. install new approved csst piping in designated areas, including all required fittings, supports, and connections in accordance with applicable local gas codes and manufacturer specifications.4. remove sections of sheetrock as necessary to gain access to existing gas piping and complete the installation.5. furnish and install three (3) new gas shut-off valves and three (3) new gas flex connectors for the designated gas appliances or connections.6. properly secure, support, and connect all newly installed gas piping.7. perform the required gas pressure test and leak inspection to verify the integrity of the newly installed gas piping system.8. obtain the required plumbing/mechanical permit, as applicable, and coordinate the required inspection with the local authority having jurisdiction.9. restore gas service upon successful completion of the required testing and approval, where applicable · 201 m away