3813 Durango Dr
Dallas, TX 75220
New single-family home permitted at 3813 Durango Dr
City of Dallas records show a permit for a new single-family home with an attached two-car garage at 3813 Durango Dr, filed June 26, 2025. A demolition permit was filed the day before, followed by permits for plumbing, electrical and HVAC work; an 8-foot residential fence permit was filed February 10, 2026.
Summarized from City of Dallas records · updated Feb 10, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Feb 10, 2026
- since Jun 25, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projectsSources: City of Dallas
Questions about 3813 Durango Dr
What is being built at 3813 Durango Dr in Dallas?
City permits indicate a new single-family home with an attached two-car garage. The new-construction permit, RES-NEW-25-000329, was filed June 26, 2025.
Was a building demolished at 3813 Durango Dr?
A residential demolition permit for a “blade clean lot” was filed June 25, 2025, one day before the new-construction permit.
When was the new home at 3813 Durango Dr permitted?
The City of Dallas filed the residential new-construction permit on June 26, 2025. The record describes a new single-family dwelling with an attached two-car garage.
What other permits were filed for 3813 Durango Dr?
Records include plumbing, electrical and mechanical permits filed between June and September 2025. The mechanical permit describes two 5-ton systems with ductwork.
Is a fence being installed at 3813 Durango Dr?
A permit for an 8-foot-tall residential perimeter fence was filed February 10, 2026. Its permit number is RES-ACC-26-000140.
Also being built nearby
All of 75220- 3826 Durango DrOct 24, 2025Add 8 ft fence on the back and front only, no sides · 54 m away
- 9597 Mixon DrOct 6, 2020Permanent electrical service · 77 m away
- 3813 Cortez DrMay 19, 2025This project involves the removal and disposal of approximately 156 linear feet of existing fencing. constructing 308 lf of new 8-foot tall pine board-on-board fence will be installed along the same line using metal posts set in concrete for added durability. four horizontal rails will support the vertical pickets, ensuring structural integrity and a consistent appearance. a 1x4 decorative top trim will be installed to enhance the fence’s finished look. all debris will be removed from the site, and the work area will be cleaned upon completion · 103 m away
- 3819 Davila DrSep 11, 2026Replacing a 200 amp panel, grounding and surge protection · 107 m away
- 3803 Davila DrJun 3, 2026Fixtures installation onlysomeone else made the roug and top out plumbing · 111 m away
- 3842 Durango DrDec 4, 2020Construct new sfd · 114 m away
- 3812 Cortez DrMar 11, 2026Gas line to pool heater · 116 m away
- 3832 Davila DrAug 27, 2026Install all fixtures for final with a gas test · 120 m away
- 3847 Durango DrJun 10, 2026Gas test · 128 m away
- 3835 Cortez DrAug 12, 20263835 cortez reset reshim 1230 sq ft to stabilize foundation · 132 m away
- 3770 Durango DrOct 16, 2025Install new meter base/old one damaged · 138 m away
- 3851 Durango DrOct 30, 2020Demolition sfd · 143 m away