3849 Wemdon Dr
Dallas, TX 75220
3849 Wemdon Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 3849 Wemdon Dr, Dallas, TX 75220. The most recent, filed June 10, 2025, covers: “Remove old fence and install new fence 8ft height, board-on-board”.
Compiled from City of Dallas records · updated Jun 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 10, 2025
- since Jun 10, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3849 Wemdon Dr
What is being built at 3849 Wemdon Dr?
The latest filing (City of Dallas permit RES-ACC-25-000153, June 10, 2025) covers remove old fence and install new fence 8ft height, board-on-board.
How many permits and filings does 3849 Wemdon Dr have?
1 filing across 1 project, from June 10, 2025 to June 10, 2025.
Is there other construction near 3849 Wemdon Dr?
Yes. Nearby filings include 3869 Wemdon Dr (new gas connection from gas meter to pool heater, Aug 10, 2026); 3862 Cortez Dr (nsfaa 3862 cortez drive, nsfd, Jun 22, 2026); 3835 Cortez Dr (3835 cortez reset reshim 1230 sq ft to stabilize foundation, Aug 12, 2026).
How do I get alerts for new permits at 3849 Wemdon Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75220- 3869 Wemdon DrAug 10, 2026New gas connection from gas meter to pool heater · 35 m away
- 3862 Cortez DrJun 22, 2026Nsfaa 3862 cortez drive, nsfd · 104 m away
- 3835 Cortez DrAug 12, 20263835 cortez reset reshim 1230 sq ft to stabilize foundation · 108 m away
- 3919 Wemdon DrOct 14, 2026Fixed leak on gas 90 going into house. gas test · 117 m away
- 3842 Eaton DrOct 3, 2025Install full hvac ductwork · 133 m away
- 3935 Hawick LnJul 28, 20258' cedar fence for residential home · 146 m away
- 3812 Cortez DrMar 11, 2026Gas line to pool heater · 155 m away
- 3879 Cortez DrOct 30, 2026New a/c · 155 m away
- 3917 Hawick LnJul 24, 2025Re roof · 158 m away
- 3813 Cortez DrMay 19, 2025This project involves the removal and disposal of approximately 156 linear feet of existing fencing. constructing 308 lf of new 8-foot tall pine board-on-board fence will be installed along the same line using metal posts set in concrete for added durability. four horizontal rails will support the vertical pickets, ensuring structural integrity and a consistent appearance. a 1x4 decorative top trim will be installed to enhance the fence’s finished look. all debris will be removed from the site, and the work area will be cleaned upon completion · 162 m away
- 3928 Hawick LnMay 21, 20268ft fence · 162 m away
- 3924 Hawick LnAug 21, 2025Replace meter can along with 2in risertree fell on riser and damaged service · 165 m away