4205 W Northwest Hwy
Dallas, TX 75220
Irrigation backflow device replaced at 4205 W Northwest Hwy
A failed backflow device for irrigation was replaced with a new device outside at 4205 W Northwest Hwy. The City of Dallas permit, COM-PLM-26-000819, was filed April 14, 2026.
Summarized from City of Dallas records · updated Apr 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 14, 2026
- since Apr 14, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplaced existing failed backflow device sn: a01238 with new backflow device sn: akj8655 located outside for irrigation
Replaced existing failed backflow device sn: a01238 with new backflow device sn: akj8655 located outside for irrigation
City of Dallas permitCommercial Plumbing Permit
Sources: City of Dallas
Questions about 4205 W Northwest Hwy
What is being built at 4205 W Northwest Hwy?
The permit record describes replacement of an existing failed backflow device with a new one for irrigation. It does not describe a new building.
What work was permitted at 4205 W Northwest Hwy?
A commercial plumbing permit covers replacement of an existing failed backflow device located outside for irrigation.
When was the permit filed for 4205 W Northwest Hwy?
The City of Dallas filed permit COM-PLM-26-000819 on April 14, 2026.
Is new construction planned at 4205 W Northwest Hwy?
The listed permit is for backflow device replacement, not building construction. The record does not provide details about other construction plans.
How much will the work at 4205 W Northwest Hwy cost?
The permit record does not list a project valuation or cost estimate.
Also being built nearby
All of 75220- 9117 La Strada CtJan 15, 2021Replace or modify existing hvac · 29 m away
- 7 Cochran Creek CtSep 18, 2026Reroof- t/o & refelt with roof runner syn felt. reshingle with cr clim flex weatherwood llt class c comp · 50 m away
- 1 Cochran Oaks LnSep 28, 2020Remove existing roof and install new roof · 51 m away
- 11 Cochran Oaks LnSep 23, 2020Remove existing roof and install new roof · 52 m away
- 11 Cochran Oaks LnJul 8, 2026Hvac replacement carrier 2 ton sca26 comfort horizontal gas complete · 52 m away
- 13 Cochran Oaks LnMay 5, 2026Partial gas line replacement in the attic · 52 m away
- 19 Cochran Oaks LnAug 10, 2026Reroof- t/o & refelt with max felt syn. reshingle with cr clim flex weathwd llt class c comp · 54 m away
- 21 Cochran Oaks LnNov 17, 2025Remove and replace asphalt shingle roof · 55 m away
- 25 Cochran Oaks LnAug 4, 2026Tunnel up to 5 ft sewerline repair · 56 m away
- 24 Cochran Oaks LnAug 18, 2025Replace hvac system · 67 m away
- 9143 Bluff Hollow CtJun 11, 2025New construction plumbing · 121 m away
- 9206 Esplanade DrDec 2, 2025Replace (2) package units on roof with roof curbs · 131 m away