4214 Williamsburg Rd
Dallas, TX 75220
Roof replacement permitted at 4214 Williamsburg Rd
A permit filed August 19, 2025, covers removing and replacing the asphalt-composition roof at 4214 Williamsburg Rd, with repairs to damaged roof sheathing if needed. Earlier City of Dallas permits in 2020 covered plumbing alterations and a water heater installation.
Summarized from City of Dallas records · updated Aug 19, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Aug 19, 2025
- since Nov 25, 2020
- Largest scope
- —
- Listed value
- $5K
- partial · often understated
Permit & project history
3 projectsSources: City of Dallas
Questions about 4214 Williamsburg Rd
What is being built at 4214 Williamsburg Rd?
The latest permit covers removing and replacing the asphalt-composition roof, with roof sheathing repairs if needed. It does not describe a new building.
When was the roof replacement permitted at 4214 Williamsburg Rd?
The City of Dallas filed permit RES-ROOF-25-000700 on August 19, 2025.
Is a new home being built at 4214 Williamsburg Rd?
The records provided do not show a new-home project. They show a roof replacement permit in 2025 and plumbing permits in 2020.
What plumbing work was permitted at 4214 Williamsburg Rd?
A City of Dallas permit filed November 25, 2020, covered remodeling existing plumbing. A separate permit filed April 29, 2020, covered installing a water heater.
What is permit RES-ROOF-25-000700 for?
It is for removing and replacing the asphalt-composition roof at 4214 Williamsburg Rd, with repairs to damaged roof sheathing if needed. The City of Dallas filing date was August 19, 2025.
Also being built nearby
All of 75220- 4234 Williamsburg RdApr 27, 2026Re-roof the home · 34 m away
- 4242 Williamsburg RdApr 13, 2026Ga line to pool heater and fire pit · 47 m away
- 4243 Williamsburg RdApr 10, 2026Gas leak repair · 49 m away
- 4213 Willow Grove RdJan 12, 2026The project is a 7' high wrought iron fence with 2'x2'x8' stone columns spaced evenly. the fence will go from one side yard to the front, across the front with automatic 7' wrought iron gates across each driveway (2), and then back down the opposite side yard. one 7' tall pedestrian gate will be provided for visitors, mail, packages, etc. towards the rear of the house on each side yard will be 1' x 7' stone walls for privacy.underneath the fence will be 18"w x 18" deep wall foundation pavement with the columns sitting on the pavement, this will ensure proper drainage and extend the life of the fence. the columns will be wired with electricity, although lights on top of each column are not planned at this time · 118 m away
- 4223 Willow Grove RdOct 27, 2026Install new electrical · 120 m away
- 4237 Willow Grove RdJun 26, 2025Tear-off one layer of composition shingles and one layer of roofing underlayment; install synthetic underlayment; reroof with limited lifetime manufacturer's warranty gaf timberline hdz class 3 shingles in slate · 125 m away
- 4204 Walnut Hill LnMay 11, 2026Install new hvac · 125 m away
- 4214 Walnut Hill LnJun 25, 2026Install new plumbing systems for new house · 126 m away
- 4214 Walnut Hill LnJul 6, 2026Electrical for residential new construction · 126 m away
- 4222 Willow Grove RdOct 2, 2026Run gas line to pool heater · 132 m away
- 4236 Willow Grove RdFeb 3, 2026Horizontal attic installation serving the upper left portion of the home. no new duct work except where noted. existing duct system to remain. attic access via pull-down stairs · 137 m away
- 4207 Walnut Hill LnSep 22, 2026Rsvp-single family - new construction · 150 m away