4950 Wedgewood Ln
Dallas, TX 75220
Pool work and a 100 kW standby generator at 4950 Wedgewood Ln
Residential permits at 4950 Wedgewood Ln cover electrical work for a pool, two pool heater connections, and installation of a 100 kW natural-gas standby generator. The generator permits were filed October 27, 2025; the pool electrical permit was filed January 26, 2026, and the heater connections permit was filed August 20, 2026.
Summarized from City of Dallas records · updated Aug 20, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Aug 20, 2026
- since Oct 27, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsPermanent generator: generac 100kw standby generator and 400a automatic transfer switch installation. fuel type: ng
Permanent generator: generac 100kw standby generator and 400a automatic transfer switch installation. fuel type: ng
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 4950 Wedgewood Ln
What work is permitted at 4950 Wedgewood Ln in Dallas?
City of Dallas residential permits cover pool electrical work, two pool heater connections, and a 100 kW natural-gas standby generator. The filings run from October 27, 2025, through August 20, 2026.
Is a new pool being built at 4950 Wedgewood Ln?
The records list electrical work for a pool and two pool heater connections. They do not specify that a new pool is being built.
Is a generator being installed at 4950 Wedgewood Ln?
Yes. A City of Dallas electrical permit describes installation of a 100 kW natural-gas standby generator and a 400-amp automatic transfer switch. The permit was filed October 27, 2025, under RES-ELC-25-004047.
When were the pool permits filed at 4950 Wedgewood Ln?
The pool electrical permit, RES-ELC-26-000458, was filed January 26, 2026. A plumbing permit for two pool heater connections, RES-PLM-26-008812, was filed August 20, 2026.
What is the natural-gas permit for at 4950 Wedgewood Ln?
Permit RES-PLM-25-006582 describes a new underground natural-gas line and connection to a 100 kW standby generator. It was filed October 27, 2025.
Also being built nearby
All of 75220- 4965 Wedgewood LnJan 11, 2021Gas relay or repair with test · 32 m away
- 4915 Wedgewood LnAug 13, 2025Residential hvac change out. 5 ton 15 seer american standard · 81 m away
- 9426 Sunnybrook LnDec 17, 2020Gas relay or repair with test · 162 m away
- 5020 Park LnNov 5, 2026Gas repair for service to be restored · 182 m away
- 4800 Park LnAug 26, 20253 ton gas system · 195 m away
- 4907 Deloache AveJan 13, 2026Install gas to generator · 199 m away
- 9784 Audubon PlFeb 11, 20261.replace tankless water heater for guest house (off garage).2.install whole house water monitor on main water supply · 204 m away
- 9785 Audubon PlNov 12, 2026Install new rheem 75 gallon gas power vent water heater. prog-g75-76n-rh-pv · 207 m away
- 9700 Audubon PlNov 17, 2026Install gas line · 216 m away
- 4926 Deloache AveOct 6, 2026Gas test · 231 m away
- 9727 Audubon PlOct 27, 2026Mcr new pool and spa construction. gunite shell · 238 m away
- 9746 Audubon PlMar 31, 2026Hvac changeout: replace two existing 4-ton condensers and matching up-flow evaporator coils. no structural change · 240 m away