5018 Radbrook Pl
Dallas, TX 75220
5018 Radbrook Pl: 1 project on record
City of Dallas lists 1 filing across 1 project at 5018 Radbrook Pl, Dallas, TX 75220. The most recent, filed September 16, 2025, covers: “Install tesla charger on opposite side of garage. 200a eaton br panel - 60a circuit”.
Compiled from City of Dallas records · updated Sep 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 16, 2025
- since Sep 16, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 5018 Radbrook Pl
What is being built at 5018 Radbrook Pl?
The latest filing (City of Dallas permit RES-ELC-25-003096, September 16, 2025) covers install tesla charger on opposite side of garage. 200a eaton br panel - 60a circuit.
How many permits and filings does 5018 Radbrook Pl have?
1 filing across 1 project, from September 16, 2025 to September 16, 2025.
Is there other construction near 5018 Radbrook Pl?
Yes. Nearby filings include 5008 Radbrook Pl (electrical for 2 gate operators, Jan 29, 2026); 5007 Radbrook Pl (install new 50 gallon gas water heater, Dec 18, 2025); 9203 Sunnybrook Ln (furnish and install ats 60kw generator, Jul 8, 2025).
How do I get alerts for new permits at 5018 Radbrook Pl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75220- 5008 Radbrook PlJan 29, 2026Electrical for 2 gate operators · 22 m away
- 5007 Radbrook PlDec 18, 2025Install new 50 gallon gas water heater · 30 m away
- 9203 Sunnybrook LnJul 8, 2025Furnish and install ats 60kw generator · 56 m away
- 5046 Radbrook PlMay 12, 2025Install new hvac · 60 m away
- 9221 Sunnybrook LnJul 16, 2026New construction electrical · 87 m away
- 9246 Sunnybrook LnMay 27, 2026Mcr with battery system size: 17820w dc, 64000w ac modules: (44) runergy hy-dh108p8b-405 (405w) inverter(s): (4) eg4 electronics llc eg4 flexboss21 \| iv-16000-hyb-aw-fx-xx [240v] optimizers (s): (44) tigo ts4-a-o racking: opsun performance 10 ballasted attachment: opsun ballasted micro-grid interconnect:(2) 200a eg4® grid boss mid (model #:mi-200-2p-hyb-aw-01) battery: (4) eg4® wallmount all weather battery wp-16/280-1awll, 14.3kwhall work subject to field inspector approval · 138 m away
- 4916 Radbrook PlDec 3, 2025Installing a tesla ev charger next to panel · 179 m away
- 5047 Radbrook PlJan 27, 2021Install new hvac · 186 m away
- 4915 Radbrook PlOct 1, 2026Mcr new pool and spa · 190 m away
- 5109 Radbrook PlDec 14, 2020Install lawn sprinkler · 195 m away
- 4818 Brookview DrAug 31, 2026Remove and replace driveway. remove and replace approach. remove and replace approach with culvert · 242 m away
- 4830 Brookview DrApr 22, 2026Evaporator coil replacement · 244 m away