5102 Lakehill Ct
Dallas, TX 75220
5102 Lakehill Ct: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 5102 Lakehill Ct, Dallas, TX 75220 since May 21, 2025. The most recent, filed May 27, 2025, covers: “Run gas line for generator install”.
Compiled from City of Dallas records · updated May 27, 2025
- Projects
- 2
- 2 filings
- Latest filing
- May 27, 2025
- since May 21, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 5102 Lakehill Ct
What is being built at 5102 Lakehill Ct?
The latest filing (City of Dallas permit RES-PLM-25-000675, May 27, 2025) covers run gas line for generator install.
How many permits and filings does 5102 Lakehill Ct have?
2 filings across 2 projects, from May 21, 2025 to May 27, 2025.
Is there other construction near 5102 Lakehill Ct?
Yes. Nearby filings include 5101 Lakehill Ct (4.0 ton system for the master bedroom, May 19, 2025); 5105 Lakehill Ct (replace yard lines for gas lamps, Dec 16, 2025); 5075 Lakehill Ct (demolition all structures and foundation, Feb 24, 2026).
How do I get alerts for new permits at 5102 Lakehill Ct?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75220- 5101 Lakehill CtMay 19, 20254.0 ton system for the master bedroom · 13 m away
- 5105 Lakehill CtDec 16, 2025Replace yard lines for gas lamps · 13 m away
- 5075 Lakehill CtFeb 24, 2026Demolition all structures and foundation · 74 m away
- 5042 Lakehill CtMar 18, 20262-hvac systems replacement · 160 m away
- 5030 Ravine DrDec 21, 2020Install water heater · 168 m away
- 9630 Inwood RdAug 14, 20261. new 1 1/2" pex water service from meter to house with customer shut off valve, & filter loop in stairway closet with halo carbon/salt system. add tee for fire system connection. 2. pex water piping installed in crawlspace and overhead with split-seam pipe insulation 3. bid includes 2 icemaker supply boxes and 1 washer drain/supply box with air hammer arrestors per code 4. install single valve with wall head at all tubs and showers, master shower includes two valves & two wall heads 5. install dual navien npe240a2 hybrid tankless units in crawlspace with flood stop valve and 1" hot circulation loop 6. bid inlcudes 4 total exterior frostproof hydrants at builder specified locations 7. plumb for sink pump at bar sink, slab foundation, and pipe to nearest plumbing drain with access to crawlspace 8. install new 1" poly underground gas service from house stub out to outdoor kitchen, appliance connections by others 9. all sinks are bid with standard drain/supply connections, no custom water or drain connections are included 10. any additional plumbing not included in bid and requested by gc is billed as t&m on separate change order · 261 m away
- 9727 Audubon PlOct 27, 2026Mcr new pool and spa construction. gunite shell · 355 m away
- 5200 Park LnJul 14, 2026Install electrical for new construction · 356 m away
- 9785 Audubon PlNov 12, 2026Install new rheem 75 gallon gas power vent water heater. prog-g75-76n-rh-pv · 367 m away
- 9700 Audubon PlNov 17, 2026Install gas line · 372 m away
- 9784 Audubon PlFeb 11, 20261.replace tankless water heater for guest house (off garage).2.install whole house water monitor on main water supply · 375 m away
- 9746 Audubon PlMar 31, 2026Hvac changeout: replace two existing 4-ton condensers and matching up-flow evaporator coils. no structural change · 375 m away