9432 Thornberry Ln
Dallas, TX 75220
Master shower P-trap replacement at 9432 Thornberry Ln
A City of Dallas plumbing permit filed May 6, 2026, indicates a master shower P-trap was replaced after concrete entered it during recent tile work. The repair used a two-foot tunnel. An earlier permit filed November 5, 2020, covered remodeling existing plumbing.
Summarized from City of Dallas records · updated May 6, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 6, 2026
- since Nov 5, 2020
- Largest scope
- —
- Listed value
- $15
- partial · often understated
Permit & project history
2 projectsConcrete got inside master shower p trap from new tile work that was donerecently. got new p trap replaced by 2 ft tunnel
Concrete got inside master shower p trap from new tile work that was donerecently. got new p trap replaced by 2 ft tunnel
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 9432 Thornberry Ln
What is being built at 9432 Thornberry Ln?
The latest permit describes a plumbing repair, not a new building: replacement of the master shower P-trap after concrete entered it during tile work.
What work was permitted at 9432 Thornberry Ln?
The May 6, 2026, City of Dallas permit, RES-PLM-26-004710, describes replacing the master shower P-trap using a two-foot tunnel.
When was the plumbing repair permitted?
The City of Dallas filed permit RES-PLM-26-004710 on May 6, 2026.
Has 9432 Thornberry Ln had earlier plumbing work?
Yes. A City of Dallas permit filed November 5, 2020, described remodeling existing plumbing.
Is a new home or commercial building planned at 9432 Thornberry Ln?
The records provided describe plumbing work, including a master shower P-trap replacement. They do not identify a new building project at this address.
Also being built nearby
All of 75220- 9427 Thornberry LnAug 25, 2026Installing shower pan/liner in primary bathroom. relocating tub drain to accommodate free standing tub. installing thermostatic mixing valve to accommodate tub valve. installing new shower valve · 22 m away
- 9420 Thornberry LnSep 9, 2026In-ground swimming pool/spa with heater · 37 m away
- 9421 Thornberry LnJul 29, 2026Wire pool · 39 m away
- 9403 Thornberry LnNov 16, 2026Installing all plumbing for new construction · 93 m away
- 9466 Thornberry LnJun 11, 2025Add 77 linear feet of 8-foot high fence in north east corner of property · 105 m away
- 9424 Monteleon CtJan 2, 2026Ground and bond inground pool to main grounding system.finish the inspections for the permit res-pool-25-000127 · 111 m away
- 9438 Green Terrace DrNov 18, 2020Addition to sfd · 117 m away
- 9451 Monteleon CtOct 19, 2020Remove existing roof and install new roof · 125 m away
- 4011 Wellingshire LnMar 2, 2026Rerooftear off54 sq · 165 m away
- 4016 Wellingshire LnApr 1, 20262 complete hvac changeout (4 ton 17 seer gas horizontal lennox system and 3 ton 17 seer gas horizontal lennox system) · 169 m away
- 4021 Wellingshire LnFeb 17, 2026Reroof- tearoff existing shingles and install new shingles · 169 m away
- 3949 Cortez DrFeb 26, 2026We are adding a 33 foot driveway with a 16 ft approach with 3 ft radius wings · 217 m away