9826 Hathaway St
Dallas, TX 75220
9826 Hathaway St: 1 project on record
City of Dallas lists 1 filing across 1 project at 9826 Hathaway St, Dallas, TX 75220. The most recent, filed November 30, 2020, covers: “Gas relay or repair with test”.
Compiled from City of Dallas records · updated Nov 30, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Nov 30, 2020
- since Nov 30, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9826 Hathaway St
What is being built at 9826 Hathaway St?
The latest filing (City of Dallas permit 2011303057, November 30, 2020) covers gas relay or repair with test.
How many permits and filings does 9826 Hathaway St have?
1 filing across 1 project, from November 30, 2020 to November 30, 2020.
What is being built near Congregation Shearith Israel in Dallas?
9826 Hathaway St is about 246 m from Congregation Shearith Israel (9401 Douglas Ave). Its latest filing is for gas relay or repair with test.
Is there other construction near 9826 Hathaway St?
Yes. Nearby filings include 5556 Falls Rd (install fence, Nov 4, 2020); 9746 Hathaway St (remodel- 8' x 35' open rafter pergola, Dec 2, 2020); 9736 Hathaway St (re-roofing, Mar 30, 2026).
How do I get alerts for new permits at 9826 Hathaway St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75220- 5556 Falls RdNov 4, 2020Install fence · 128 m away
- 9746 Hathaway StDec 2, 2020Remodel- 8' x 35' open rafter pergola · 139 m away
- 9736 Hathaway StMar 30, 2026Re-roofing · 156 m away
- 5558 Edlen DrSep 15, 2020Remodel existing plumbing · 161 m away
- 9924 Hathaway StJul 14, 2025Tank to tankless · 166 m away
- 5550 Edlen DrDec 31, 2025X2 50 gal gas water heaters in outside closet · 175 m away
- 5531 Falls RdJan 4, 2021Remodel existing plumbing · 185 m away
- 9714 Hathaway StDec 3, 2025Replacing a 5 ton gas furnace · 191 m away
- 5525 Falls RdSep 14, 2026Replace hvac · 200 m away
- 9401 Douglas Ave · Congregation Shearith IsraelNov 17, 2026~300 sq ft guard house structure · 246 m away
- 5707 Watson CirAug 14, 2026Reframe the roof by converting the existing full cone into a half-cone design and seamlessly tie the new framing into the existing roof slopes. install new iko royal estate shingles harvest slate color · 247 m away
- 5731 Watson CirDec 9, 2020Gas test · 263 m away