9972 Coppedge Ln
Dallas, TX 75220
Single-family home permitted after 2020 demolition
Dallas records show a single-family home was permitted for new construction at 9972 Coppedge Ln on January 26, 2021, after a demolition permit for a single-family home was filed on December 15, 2020. More recent permits record a heat pump replacement in June 2025 and backflow replacement in October 2025.
Summarized from City of Dallas records · updated Oct 12, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Oct 12, 2025
- since Dec 15, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Dallas
Questions about 9972 Coppedge Ln
What was built at 9972 Coppedge Ln?
A City of Dallas permit records new construction of a single-family home at the address. The permit was filed January 26, 2021.
Was a house demolished at 9972 Coppedge Ln?
A City of Dallas demolition permit for a single-family home was filed on December 15, 2020. A permit for new single-family construction followed on January 26, 2021.
What recent work has been permitted at 9972 Coppedge Ln?
City records show a four-ton heat pump system replacement permitted June 18, 2025, and a backflow replacement permitted October 12, 2025.
Is new construction planned at 9972 Coppedge Ln?
The records provided show a single-family new-construction permit dated January 26, 2021. They do not identify a newer new-construction project at the address.
What is being built near Northway Church on Coppedge Lane?
At 9972 Coppedge Ln, about 126 meters from Northway Church, Dallas records show a single-family home permitted for new construction in January 2021. Later permits cover replacement plumbing and heating equipment.
Also being built nearby
All of 75220- 9946 Coppedge LnApr 2, 2026New residential hvac installation · 79 m away
- 9942 Coppedge LnJan 5, 2021Construct new sfd · 92 m away
- 9961 Dresden DrJul 11, 2025Wreck and haul off debris from residential structutre. scrape lot of positive drainage · 101 m away
- 9960 Dresden DrMar 30, 2026Replacing one 40 gal water heater · 107 m away
- 3877 Walnut Hill Ln · Northway ChurchJul 7, 2025New 2-1/2" domestic water line to building · 126 m away
- 10009 Coppedge LnMay 29, 2025Replacing sewer line under slab · 130 m away
- 3888 Walnut Hill LnApr 27, 2026Install 8’ board on board cedar fence around perimeter of lot, metal posts · 137 m away
- 3810 Seguin DrNov 10, 2026Gas line to grill · 148 m away
- 9935 Coppedge LnMay 30, 2025Repairing and replacing existing fence for new construction · 152 m away
- 10025 Coppedge LnMay 12, 2026Replacing the main electric panel and adding an emergency disconnect · 153 m away
- 3820 Seguin DrJan 25, 2021Install lawn sprinkler · 161 m away
- 3826 Seguin DrOct 3, 2025Installing an 8 feet tall wood fence · 169 m away
More demolitions in 75220.