2908 Samuell Blvd
Dallas, TX 75223
Interior remodel connects suites 101 and 102 at 2908 Samuell Blvd
A commercial interior remodel at 2908 Samuell Blvd involves removing an 11-foot section of non-load-bearing wall between suites 101 and 102. The City of Dallas permit was filed June 17, 2025, under permit COM-ALT-ADD-25-000430.
Summarized from City of Dallas records · updated Jun 17, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 17, 2025
- since Jun 17, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectInterior remodelremoving 11ft section of non load bearing wall betweensuite 101 and 102
Interior remodelremoving 11ft section of non load bearing wall betweensuite 101 and 102
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 2908 Samuell Blvd
What is being built at 2908 Samuell Blvd in Dallas?
A commercial interior remodel will remove an 11-foot section of non-load-bearing wall between suites 101 and 102, according to City of Dallas permit COM-ALT-ADD-25-000430.
When was the remodel at 2908 Samuell Blvd permitted?
The permit was filed June 17, 2025.
Which suites are being changed at 2908 Samuell Blvd?
The work is between suites 101 and 102, where the permit describes removing part of a non-load-bearing wall.
Is the wall removal at 2908 Samuell Blvd structural?
The permit describes the wall as non-load-bearing.
Is a new business opening at 2908 Samuell Blvd?
The permit record does not identify a business or tenant. It describes an interior remodel between suites 101 and 102.
Also being built nearby
All of 75223- 2916 Samuell BlvdAug 25, 2025Pave with concrete for car parking · 9 m away
- 3076 Samuell Boulevard · Regency MotelSep 28, 2024Regency motel — renovation/alteration — interior remodeling · 192 m away
- 3076 Samuell BlvdAug 5, 2025Installation of 5 exhaust fans bathroom · 192 m away
- 5710 E R L Thornton FwyJun 24, 2026Remove and dispose of existing 25-ton split hvac system; install new 25-ton split hvac system (hvac changeout/alteration) · 215 m away
- 5600 East Grand AveApr 17, 2026Gas test · 305 m away
- 5623 East Grand AveAug 31, 2026Relay sewer line from building to sewer tap · 308 m away
- 3018 Culver StAug 28, 2026Gas test job · 312 m away
- 5605 East Grand AveAug 4, 2026Convert full wall to a partial wall (non-baring wall) · 315 m away
- 5550 East Grand AveJul 18, 2025Removal of any existing wheel stops and installation of parking bollards to ensure building & customer safety. no additional site or building work to be done · 335 m away
- 5634 Culver StDec 1, 2020Gas test (atmos) · 356 m away
- 5526 E R L Thornton FwySep 16, 2025Renovation and building expansion of existing gas station convenience store, including addition of new quick service restaurant with drive-through. area: existing 1,588 + addition 2,412 = 4,000 sq ft total building · 358 m away
- 5526 East Rl Thornton Freeway · Modern Pyramids, Inc.Sep 3, 2025New quick service restaurant — additions to existing building — renovation and building expansion of existing gas station convenience store, including addition of new quick service restaurant with drive-through. area: existing 1,588 + addition 2,412 = 4,000 sq ft total building · 358 m away