523 Cristler Ave
Dallas, TX 75223
Driveway paving permitted at 523 Cristler Ave
A residential driveway paving project was permitted at 523 Cristler Ave on October 8, 2026. The permit description says the new paving will run from the front of the house along its side.
Summarized from City of Dallas records · updated Oct 8, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 8, 2026
- since Oct 8, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectWe are doing a new paving driveway from the front of the house all down to the side of the house
We are doing a new paving driveway from the front of the house all down to the side of the house
City of Dallas permitResidential Drive Approach and Sidewalk Permit
Sources: City of Dallas
Questions about 523 Cristler Ave
What is being built at 523 Cristler Ave?
A City of Dallas permit indicates new driveway paving from the front of the house along its side.
When was the driveway paving permit filed at 523 Cristler Ave?
The permit was filed on October 8, 2026.
What is the permit number for 523 Cristler Ave?
The City of Dallas permit number is RES-DSW-26-000465.
Is a new house being built at 523 Cristler Ave?
The available permit record is for residential driveway paving, not a new house.
What does the permit cover at 523 Cristler Ave in Dallas 75223?
It is a Residential Drive Approach and Sidewalk Permit. Its description specifies new paving for a driveway extending from the front of the house along the side.
Also being built nearby
All of 75223- 522 Cristler AveDec 30, 2025Electrical for addition · 13 m away
- 508 Cristler AveJul 29, 2025Nsfaa-508 cristler - remodel existing garage · 19 m away
- 501 Cristler AveSep 16, 2025Replacing panel and meter base · 23 m away
- 520 S Glasgow DrMay 21, 2026Plumbing associated with permit #res-new-26-000552 · 89 m away
- 522 S Glasgow DrSep 29, 2026New hvac on a new contstruction of a duplex · 89 m away
- 514 S Glasgow DrJun 18, 2025Build 8 ft tall fence going around the property, with 3 gates · 89 m away
- 502 S Glasgow DrJul 17, 2026New wire for house 200 amp service · 91 m away
- 601 Cristler AveNov 9, 20261.structural framing: replace ten (10) 2x6 framing members (joists) and two (2) 4x6 structural support posts.2.subflooring: remove and replace ten (10) sections of subfloor.3.foundation leveling: level the existing house foundation · 92 m away
- 603 Cristler AveNov 12, 20261.structural framing: replace ten (10) 2x6 framing members (joists) and two (2) 4x6 structural support posts. 2.subflooring: remove and replace ten (10) sections of subfloor. 3.foundation leveling: level the existing house foundation · 94 m away
- 517 S Glasgow DrFeb 5, 2026Repair gas piping and do a gas test · 102 m away
- 505 S Glasgow DrDec 16, 2020Install fence · 103 m away
- 419 Cristler AveJul 17, 20268 1/2' wood fence on steel posts · 108 m away