810 Newell Ave
Dallas, TX 75223
810 Newell Ave: 3 projects on record
City of Dallas lists 3 filings across 3 projects at 810 Newell Ave, Dallas, TX 75223. The most recent, filed November 19, 2020, covers: “Install fence”.
Compiled from City of Dallas records · updated Nov 19, 2020
- Projects
- 3
- 3 filings
- Latest filing
- Nov 19, 2020
- since Nov 19, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 810 Newell Ave
What is being built at 810 Newell Ave?
The latest filing (City of Dallas permit 2011031080, November 19, 2020) covers install fence.
How many permits and filings does 810 Newell Ave have?
3 filings across 3 projects, from November 19, 2020 to November 19, 2020.
Is there other construction near 810 Newell Ave?
Yes. Nearby filings include 815 Newell Ave (replace aging architectural style roof shingles with same style shingles, Sep 22, 2026); 803 Newell Ave (remove old composition shingles & install new composition shingles, Mar 9, 2026); 819 Newell Ave (convert 200 amp overhead meter base and rise to underground service, Jun 11, 2025).
How do I get alerts for new permits at 810 Newell Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75223- 815 Newell AveSep 22, 2026Replace aging architectural style roof shingles with same style shingles · 13 m away
- 803 Newell AveMar 9, 2026Remove old composition shingles & install new composition shingles · 15 m away
- 819 Newell AveJun 11, 2025Convert 200 amp overhead meter base and rise to underground service · 15 m away
- 6915 Lindsley AveDec 3, 2020Replace or modify existing hvac · 37 m away
- 6926 Lindsley AveSep 30, 2026Install a new air conditioning and heating system with ductwork · 57 m away
- 6931 Lindsley AveAug 6, 2026Ductwork · 65 m away
- 6935 Lindsley AveJul 23, 2026We are reroofing the home with a similar-colored shingle. the home has a 3-tab shingle currently that is not still in circulation. we would be going back with gaf 30 year laminated shingles - timberline ns barkwood. we are not making any other changes other than possible code-related items such as a cricket behind the chimney or lining in the valleys below the shingles · 73 m away
- 6915 San Mateo BlvdMay 15, 2025Installing new water yard service from meter to house with new pex pipe · 81 m away
- 6939 San Mateo BlvdSep 30, 2020Replace or modify existing hvac · 98 m away
- 6930 San Mateo BlvdFeb 24, 2026Nsfaa-cd approval is for the removal of a pergola and the replacement and reconstruction of front porch to match previous existing conditions per documented assurance under ord. 26884(4)(12) per specifications and photos stamped 2.17.2026 · 101 m away
- 802 Monte Vista DrNov 14, 2025Replace 5 ton furn only · 104 m away
- 816 Monte Vista DrJun 23, 2025New board-on-board fence along the north side of the property. the fence will be 8'0" tall where it sits on the natural grade. a new concrete retaining wall will also be constructed, as shown on the grading and drainage plan, to create a +/- level back garden. the fence on top of the retaining wall will be 7'0", for a total max height of 9'0". the retaining wall will be constructed on either side of the new adu, and a 7'0" board-on-board fence will be built on top · 104 m away