groundranger
Recent · latest filing Sep 2025Residential

1522 Nantuckett Dr

Dallas, TX 75224

1522 Nantuckett Dr: 1 project on record

City of Dallas lists 1 filing across 1 project at 1522 Nantuckett Dr, Dallas, TX 75224. The most recent, filed September 5, 2025, covers: “Completing an electrical service upgrade”.

Compiled from City of Dallas records · updated Sep 5, 2025

Projects
1
1 filings
Latest filing
Sep 5, 2025
since Sep 5, 2025
Largest scope
—
Listed value
—

Permit & project history

1 project
  1. Completing an electrical service upgrade

    Completing an electrical service upgrade

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-25-002814
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 1522 Nantuckett Dr

What is being built at 1522 Nantuckett Dr?

The latest filing (City of Dallas permit RES-ELC-25-002814, September 5, 2025) covers completing an electrical service upgrade.

How many permits and filings does 1522 Nantuckett Dr have?

1 filing across 1 project, from September 5, 2025 to September 5, 2025.

Is there other construction near 1522 Nantuckett Dr?

Yes. Nearby filings include 1528 Nantuckett Dr (whole home gas line replacement1. underground gas line replacement – excavate approximately 45 linear feet of trench at a depth of 18 inches from the existing gas meter to the residence. furnish and install 45 linear feet of new 1-inch approved underground gas piping, including necessary fittings, connections, transitions, and tracer wire as required. backfill and compact trench following required inspections.2. interior gas line replacement – furnish and install approximately 45 linear feet of new approved gas piping inside the residence. includes all necessary piping, fittings, connections, supports, and labor to properly install and secure the new gas line in accordance with applicable codes.3. installation of two gas drops –install two new gas appliance drops connected to the new gas piping system. includes necessary piping, fittings, shutoff valves, and connections to designated appliance locations.4. gas pressure test – perform required pressure testing of the newly installed gas piping system to verify system integrity and identify any leaks. prepare gas system for required inspection and safe restoration of service, Oct 29, 2026); 1549 Nantuckett Dr (amana single stage. installation of a new condenser and all aluminum evaporator coil & 1 stage furnace, May 22, 2026); 3638 Cripple Creek Dr (replace 42ft sewer service, in the yard, May 30, 2025).

How do I get alerts for new permits at 1522 Nantuckett Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 75224
Get alerts for 1522 Nantuckett Dr