213 W Illinois Ave
Dallas, TX 75224
Carwash-related electrical work and new-construction filings
City of Dallas records show an electrical permit for a carwash at 213 W Illinois Ave, filed April 10, 2026. Two Phase - New Construction permits were filed June 25, 2026, but the records do not describe their scope.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Jun 30, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Jun 30, 2026
- since Aug 25, 2025
- Largest scope
- —
- Estimated cost
- $750K
- state registration
Where this project stands
Inspected · closing outQuickwash
4,331 sq ft · $750K est.
- RegisteredJun 9, 2023
- Plan review
- ConstructionSep '23 – Oct '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
6 projects2 ton trane electric package unithail guardeconomizer all accessories per planslouver equipment room x2 48x12 with back draft damperslv3 ef1 48x12euh1 qmark muh104 equipment room 480 volteuh 2,3,4 qmark juw 2500483tls with mounting bracketsexhaust fan 1 1450 cfm greenheck 120sqibinline with all accessoriesexhaust fan 2 cabinet greenheck a190 100 cfm with all accessories
2 ton trane electric package unithail guardeconomizer all accessories per planslouver equipment room x2 48x12 with back draft damperslv3 ef1 48x12euh1 qmark muh104 equipment room 480 volteuh 2,3,4 qmark juw 2500483tls with mounting bracketsexhaust fan 1 1450 cfm greenheck 120sqibinline with all accessoriesexhaust fan 2 cabinet greenheck a190 100 cfm with all accessories
City of Dallas permitCommercial Mechanical PermitNew freestanding carwash — quickwash
TDLR project registrationNew ConstructionInspection Complete4,331 sq ft$750K est.- Project #
- TABS2023021119
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 213 W Illinois Ave
What is being built at 213 W Illinois Ave in Dallas?
City of Dallas records include electrical work described as being for a carwash, along with two Phase - New Construction filings. The filings do not provide further project details.
Is a carwash planned at 213 W Illinois Ave?
A City of Dallas electrical permit filed April 10, 2026, describes electrical work for a carwash. The record does not identify an operator or provide an opening date.
When were permits filed for 213 W Illinois Ave?
The first listed filing was August 25, 2025. Recent records include two Phase - New Construction permits filed June 25, 2026, and an electrical permit filed June 30, 2026.
What do the new-construction permits at 213 W Illinois Ave cover?
Two Phase - New Construction permits, COM-PH-NEW-26-000689 and COM-PH-NEW-26-000690, were filed June 25, 2026. The records do not state what work they cover.
Who is building the project at 213 W Illinois Ave?
The City of Dallas permit records provided do not name an owner, developer, or business for the project.
Also being built nearby
All of 75224- 218 W Montana AveDec 17, 2025Repair on main building drain line · 75 m away
- 202 W Illinois AveAug 13, 2025Install a steel structure in order to prepare for another company to install signs, we are just doing structure only · 75 m away
- 213 W Montana AveOct 4, 2026Gas test · 90 m away
- 222 W Ohio AveOct 14, 2026Replaced gas line inside the house · 146 m away
- 135 W Illinois AveOct 14, 2025Rebuild a burn up. make sure everything is up to par · 175 m away
- 207 W Woodin BlvdMay 13, 2026Alteration/ addition _ electrical · 191 m away
- 123 W Illinois AveMar 25, 2026Gas test · 194 m away
- 119 W Montana AveApr 29, 2026Proposed construction of the residential driveway approach, including a minimum 10-foot-wide driveway and circular driveway configuration. one driveway approach is existing, and one new approach is proposed · 216 m away
- 110 W Illinois AveFeb 25, 2026Replace rpz at soda machine · 217 m away
- 215 Guthrie StMar 22, 2026Gas test · 238 m away
- 2206 S Beckley AveDec 1, 2020Gas test · 249 m away
- 130 W Woodin BlvdAug 27, 2026Nsfaa i will be updating flooring, sheetrock, plumbing, electrical, foundation basic updating this home · 250 m away