335 W Hobson Ave
Dallas, TX 75224
New gas line permitted for home at 335 W Hobson Ave
A new gas line from the meter to the house, with a new line inside to the furnace, was permitted on December 11, 2025. The City of Dallas record is residential plumbing permit RES-PLM-25-008749.
Summarized from City of Dallas records · updated Dec 11, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 11, 2025
- since Dec 11, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 335 W Hobson Ave
What work is planned at 335 W Hobson Ave?
A City of Dallas permit describes a new gas line from the meter to the house and a new line inside to the furnace. The permit was filed December 11, 2025.
Is a new house being built at 335 W Hobson Ave?
The record describes gas-line work at a residence, not construction of a new house. It is residential plumbing permit RES-PLM-25-008749.
When was the gas line permit filed for 335 W Hobson Ave?
The City of Dallas permit was filed on December 11, 2025.
What is permit RES-PLM-25-008749 for?
It is a residential plumbing permit for a new gas line from the meter to the house and a new line inside to the furnace. The record is dated December 11, 2025.
Is a furnace being installed at 335 W Hobson Ave?
The permit describes a new gas line inside the house to the furnace. It does not specify a furnace installation.
Also being built nearby
All of 75224- 343 W Hobson AveNov 2, 2020New wire in the whole house · 7 m away
- 318 W Hobson AveApr 24, 2026Nsfaa- 1st and 2nd floor addition attached to existing sfd · 19 m away
- 311 W Hobson AveOct 5, 2020Gas relay or repair with test · 21 m away
- 307 W Hobson AveOct 30, 2020Remodel existing plumbing · 25 m away
- 334 Terrace DrOct 8, 2025Gas test · 83 m away
- 331 Terrace DrOct 6, 2025Gas replacement inside the house and the yard · 96 m away
- 311 Terrace DrAug 19, 2025Residential demolition permit · 98 m away
- 330 W Elmore AveJul 15, 2026Electrical service repair due to fallen tree · 182 m away
- 211 W Hobson AveNov 27, 2025Removing and replacing shingles · 187 m away
- 315 W Elmore AveSep 22, 2026Upgrade service to 120/240 volt single phase 200 amp · 195 m away
- 307 W Elmore AveOct 30, 2020Remodel existing plumbing · 196 m away
- 322 W Saner AveJan 14, 2021Electrical repairs · 224 m away