22 St Laurent Pl
Dallas, TX 75225
22 St Laurent Pl: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 22 St Laurent Pl, Dallas, TX 75225 since May 12, 2025. The most recent, filed June 21, 2025, covers: “Slab leak repair in hall bath by penetration”.
Compiled from City of Dallas records · updated Jun 21, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jun 21, 2025
- since May 12, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 22 St Laurent Pl
What is being built at 22 St Laurent Pl?
The latest filing (City of Dallas permit RES-PLM-25-000100, June 21, 2025) covers slab leak repair in hall bath by penetration.
How many permits and filings does 22 St Laurent Pl have?
2 filings across 2 projects, from May 12, 2025 to June 21, 2025.
Is there other construction near 22 St Laurent Pl?
Yes. Nearby filings include 24 St Laurent Pl (remove existing roof and install new roof, Dec 30, 2020); 16 St Laurent Pl (replace hvac system with 4 ton goodman 14 seer economy horizontal gas full system; no duct work, Aug 7, 2026); 14 St Laurent Pl (replacing 4 ton condenser and coil only, Sep 3, 2026).
How do I get alerts for new permits at 22 St Laurent Pl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75225- 24 St Laurent PlDec 30, 2020Remove existing roof and install new roof · 3 m away
- 16 St Laurent PlAug 7, 2026Replace hvac system with 4 ton goodman 14 seer economy horizontal gas full system; no duct work · 9 m away
- 14 St Laurent PlSep 3, 2026Replacing 4 ton condenser and coil only · 12 m away
- 6 St Laurent PlDec 2, 2025Gas pressure test · 23 m away
- 25 St Laurent PlFeb 11, 2026Install new rheem 50 gallon gas water heater · 25 m away
- 4 St Laurent PlSep 15, 2026Install 4 monopost · 26 m away
- 7714 Caruth BlvdJul 7, 2026Nsfaa cosmetic remodel of kitchen, master bathroom, master bedroom, master closet, living room and dining room. no structural changes, new flooring, cabinetry, countertops, tile, decorative light fixtures, plumbing fixtures and appliances. adding fireplace between family room and master bedroom shared wall · 84 m away
- 17 St Laurent PlJul 12, 2026Hvac changeout: replace with new 3-ton gas split system (air handler and condenser); no structural change · 122 m away
- 7808 Boedeker StSep 28, 2026Install 17 pilings; jack pads and adjust existing pilings · 124 m away
- 7804 Boedeker StNov 10, 2026Install 14 pilings · 125 m away
- 11 St Laurent PlNov 10, 2026Replacing 3 ton gas complete system · 125 m away
- 7822 Cornerstone PkwyJul 2, 2025Run new gas line for installation of gas lanterns on exterior of home · 138 m away