4100 Colgate Ave
Dallas, TX 75225
Classroom and office renovations at 4100 Colgate Ave
City of Dallas permits indicate renovations and reconfiguration of existing classrooms and offices at 4100 Colgate Ave. The Phase 5 alteration permits were filed December 2, 2025; later permits cover mechanical, electrical and plumbing work, including a sewer line installation permit filed June 16, 2026.
Summarized from City of Dallas records · updated Jun 16, 2026
- Projects
- 19
- 19 filings
- Latest filing
- Jun 16, 2026
- since May 27, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
19 projects• demolition and removal of the following:o fcus and associated ductwork• provision and installation of the following:o (3) chilled water fcuso hangers and supports as specifiedo ductwork with insulationo fire and fire/smoke dampers, where shown on planso fire stopping for mechanical itemso grilles, registers, and diffusers with flex ducto chilled water piping utilize and reroute existing hydronic piping to new locations to greatest extent possibleo condensate drain pipingo mechanical identification
• demolition and removal of the following:o fcus and associated ductwork• provision and installation of the following:o (3) chilled water fcuso hangers and supports as specifiedo ductwork with insulationo fire and fire/smoke dampers, where shown on planso fire stopping for mechanical itemso grilles, registers, and diffusers with flex ducto chilled water piping utilize and reroute existing hydronic piping to new locations to greatest extent possibleo condensate drain pipingo mechanical identification
City of Dallas permitCommercial Mechanical Permit• demolition and removal of the following:o fcus and associated ductwork• provision and installation of the following:o (3) chilled water fcuso hangers and supports as specifiedo ductwork with insulationo fire and fire/smoke dampers, where shown on planso fire stopping for mechanical itemso grilles, registers, and diffusers with flex ducto chilled water piping? utilize and reroute existing hydronic piping to new locations to greatest extent possibleo condensate drain pipingo mechanical identification
• demolition and removal of the following:o fcus and associated ductwork• provision and installation of the following:o (3) chilled water fcuso hangers and supports as specifiedo ductwork with insulationo fire and fire/smoke dampers, where shown on planso fire stopping for mechanical itemso grilles, registers, and diffusers with flex ducto chilled water piping? utilize and reroute existing hydronic piping to new locations to greatest extent possibleo condensate drain pipingo mechanical identification
City of Dallas permitCommercial Mechanical Permit• demolition and removal of the following:o fcus and associated ductwork• provision and installation of the following:o (3) chilled water fcuso hangers and supports as specifiedo ductwork with insulationo fire and fire/smoke dampers, where shown on planso fire stopping for mechanical itemso grilles, registers, and diffusers with flex ducto chilled water piping? utilize and reroute existing hydronic piping to new locations to greatest extent possibleo condensate drain pipingo mechanical identification
• demolition and removal of the following:o fcus and associated ductwork• provision and installation of the following:o (3) chilled water fcuso hangers and supports as specifiedo ductwork with insulationo fire and fire/smoke dampers, where shown on planso fire stopping for mechanical itemso grilles, registers, and diffusers with flex ducto chilled water piping? utilize and reroute existing hydronic piping to new locations to greatest extent possibleo condensate drain pipingo mechanical identification
City of Dallas permitCommercial Mechanical Permit• demolition and removal of the following:o fcus and associated ductwork• provision and installation of the following:o (3) chilled water fcuso hangers and supports as specifiedo ductwork with insulationo fire and fire/smoke dampers, where shown on planso fire stopping for mechanical itemso grilles, registers, and diffusers with flex ducto chilled water piping? utilize and reroute existing hydronic piping to new locations to greatest extent possibleo condensate drain pipingo mechanical identification
• demolition and removal of the following:o fcus and associated ductwork• provision and installation of the following:o (3) chilled water fcuso hangers and supports as specifiedo ductwork with insulationo fire and fire/smoke dampers, where shown on planso fire stopping for mechanical itemso grilles, registers, and diffusers with flex ducto chilled water piping? utilize and reroute existing hydronic piping to new locations to greatest extent possibleo condensate drain pipingo mechanical identification
City of Dallas permitCommercial Mechanical PermitPhase 5 dsst-pvt christ the king classroom reno/ ext. workbu zo 4100 colgate ave, dallas, tx 75225 : xavier spencerbu zo interior renovation / reconfiguration of the existing offices and classrooms to provide more office space. exterior improvements include new landscape, hardscape, and a renovated exterior entrance
Phase 5 dsst-pvt christ the king classroom reno/ ext. workbu zo 4100 colgate ave, dallas, tx 75225 : xavier spencerbu zo interior renovation / reconfiguration of the existing offices and classrooms to provide more office space. exterior improvements include new landscape, hardscape, and a renovated exterior entrance
City of Dallas permitCommercial Alteration Addition PermitDsst- commercial addition:construction of a new, twostoryapprox. 25,000sqft school addition.q-team review - commercial renovation: the project alsoincludes an interior renovation to approx. 8,505 sq ft
Dsst- commercial addition:construction of a new, twostoryapprox. 25,000sqft school addition.q-team review - commercial renovation: the project alsoincludes an interior renovation to approx. 8,505 sq ft
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 4100 Colgate Ave
What is being built at 4100 Colgate Ave in Dallas?
Permits describe renovations and reconfiguration of existing classrooms and offices, along with exterior improvements. The records do not describe a new building.
When were the renovations at 4100 Colgate Ave permitted?
Phase 5 alteration permits were filed December 2, 2025. Additional mechanical, electrical and plumbing permits were filed in 2026.
Are classrooms being remodeled at 4100 Colgate Ave?
Yes. A December 2, 2025, permit describes remodeling and reconfiguring first-floor classrooms and offices.
What exterior work is planned at 4100 Colgate Ave?
The Phase 5 permit description includes new landscaping and hardscape, plus a renovated exterior entrance.
What is the latest permit for 4100 Colgate Ave?
The latest listed filing is City of Dallas permit COM-PLM-26-002199, dated June 16, 2026, for installing a sewer line.
Are mechanical systems being updated at 4100 Colgate Ave?
Permits filed January 14, 2026, describe removing fan coil units and ductwork and installing chilled-water units, ductwork and related components.
Also being built nearby
All of 75225- 4100 Colgate Avenue · Christ The King Catholic SchoolNov 4, 2024Christ the king catholic school — additions to existing building — demolition of existing 9,342 sq ft building and construction of a new, 24,810 sq ft addition. the project also includes an interior renovation of 8,505 sq ft that includes new finishes as well as reconfiguration of existing spaces
- 8111 Preston Rd · La Grange Acquisition LPApr 9, 2024Seafood restaurant — renovation/alteration — tenant finish out · 185 m away
- 8115 Preston RdMar 9, 2026Interior office remodel · 191 m away
- 2121 N Harwood St 8115 Preston Road · L&w Real Estate Llc; Danna Office LPOct 21, 2025Parkside uptown — renovation/alteration — interior fit out · 191 m away
- 8115 Preston Road · La Grange Acquisitions LPNov 5, 2024Wf 8115 preston center — renovation/alteration — interior remodel of existing lease space · 191 m away
- 8117 Preston Road · Preston Commons WestJun 13, 2024Dr. long — renovation/alteration — renovation to existing building · 194 m away
- 8117 Preston Rd · Kbs III Preston Commons LLCJul 21, 2025Electrical interior remodel · 194 m away
- 8119 Preston RdMay 19, 2026This project is for a 541-square foot remodel comprised of demolition of interior walls and replacing an existing teller-window with a glass sliding door system. project will include minimal exterior concrete work to allow for rolling carts being pushed in and out of the building and existing drive-through area · 197 m away
- 8119 Preston Road · Rb 8119 Preston LLCMar 31, 2026Goodwill attended donation centers-remodel — renovation/alteration — a 541-sq ft remodel comprised of demolition to interior walls and replacing an exterior teller window with a glass sliding door system. project will include minimal exterior concrete work to allow for rolling carts in and out of the building/drive-thro · 197 m away
- 4024 Caruth Blvd · University Park United Methodist ChurchSep 23, 2025Upumc basement class room renovation — renovation/alteration — existing class room space to be renovated, minor reconfiguration · 206 m away
- 4024 Caruth Boulevard Dallas · University Park United Methodist ChurchFeb 7, 2025University park united methodist church renovations — renovation/alteration — renovations to finishes in gathering spaces and corridors plus some new small rooms within existing spaces and replacement of doors, windows, and some interior walls to approximately 20,000 square feet of a 103,000 square foot building · 206 m away
- 6172 Sherry LnSep 9, 2026Run new supply duct · 253 m away
More demolitions in 75225, offices in 75225, schools & daycares in 75225.