A 9,000-square-foot interior office renovation is planned for the 16th floor at 5950 Berkshire Lane. The TDLR project registration, dated September 26, 2024, says the space will include offices, conference rooms and a break area; it lists an estimated project cost of $610,000.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 26, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 26, 2024
- since Sep 26, 2024
- Largest scope
- 9,000 sf
- Estimated cost
- $610K
- state registration
Where this project stands
CompletedUMB Dallas Office Renovation
9,000 sq ft · $610K est.
- RegisteredSep 26, 2024
- Plan review
- ConstructionSep '24 – Feb '25
- Inspected
- Closed
Ran as a 4-month build.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectThe project consists of interior renovation of entire 16h floor area ( 9,000 +/- sq ft). the interior of existing space is already cleared out and only new work is to occur. the space will include offices, conference rooms and break area. — the berkshire
TDLR project registrationRenovation/AlterationProject Closed9,000 sq ft$610K est.- Project #
- TABS2025001857
- Tenant / owner
- Umb Dallas Office Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 5950 Berkshire Lane 16th
What is being built at 5950 Berkshire Lane, Dallas?
The project is an interior renovation of the existing 16th-floor office space, not a new building. The TDLR registration says the renovated space will include offices, conference rooms and a break area.
When was the 5950 Berkshire Lane office project filed?
The TDLR project registration was filed September 26, 2024. It is listed as project TABS2025001857 and its status is Project Closed.
How large is the office renovation at 5950 Berkshire Lane?
The project covers approximately 9,000 square feet on the 16th floor, according to its TDLR registration.
What will the renovated office space include?
The registration describes offices, conference rooms and a break area. It says the existing space had been cleared out before the new work.
What is the estimated cost of the 5950 Berkshire Lane renovation?
The TDLR registration lists an applicant estimate of $610,000 for the project.
What's being renovated near Cio Terraces on Berkshire Lane?
A 9,000-square-foot office space on the 16th floor of 5950 Berkshire Lane is undergoing interior renovation. Cio Terraces is listed 24 meters away at 5960 Berkshire Lane.
Also being built nearby
All of 75225- 5950 Berkshire Lane · Fhf I Berkshire Tower LLCOct 14, 2025Riverside company — renovation/alteration — tenant improvement
- 5950 Berkshire LnDec 11, 2025New vav box, supply and return grilles and diffusers and associated ductwork. also, new computer room a/c unit
- 5960 Berkshire Lane 5th · Cio Terraces, LLCDec 9, 2025Berkadia expansion — renovation/alteration — interior renovation in high rise office building · 24 m away
- 5960 Berkshire Lane · Gpihrlp Terraces LPApr 30, 2026Janney — renovation/alteration — 2,774 sq ft · 24 m away
- 5960 Berkshire LnJun 5, 2026Install breakroom sink · 24 m away
- 5840 W Northwest HwyMay 5, 2025Remove existing roof ballast material from existing 5,200 sq ft built-up roof, we are not demolition'ing existing roof system.roof recover only, approx. 5,200 sq ft · 52 m away
- 5820 W Northwest HwyAug 14, 2026Electrical remodel · 87 m away
- 8343 Douglas AveOct 9, 2026Emergency repair of the existing electrical feeder serving the fire pump from the utility transformer. remove and replace the failed lb conduit body, re-pull/reconnect existing feeder conductors as required, and test and verify proper electrical operation prior to re-energization · 132 m away
- 8343 Douglas Avenue, Level 5 · Douglas CenterNov 14, 2024Knightvest residential — renovation/alteration — addition of walls to convert conference rooms into private offices. interior finish patch/fill · 132 m away
- 5944 Luther LnOct 30, 2026Mcr interior finish out of and 3125 expansion of an existing suite · 137 m away
- 5944 Luther Lane · Luther Preston Center, LLCOct 28, 2026Preferred health imaging, llc — renovation/alteration — 3,121 square feet (suite) tenant improvement · 137 m away
- 8333 Douglas Ave, 8th · Douglas Center - Hp, LPApr 9, 20248th floor corridor & restrooms — renovation/alteration — renovation of multi-tenant corridor and restrooms · 139 m away
More offices in 75225.