6310 Del Norte Ln
Dallas, TX 75225
Residential solar work permitted at 6310 Del Norte Ln
City of Dallas permits indicate roof-mounted residential solar work at 6310 Del Norte Ln, including removal of a defective system and installation of a new system. The records were filed March 22 and March 24, 2026.
Summarized from City of Dallas records · updated Mar 24, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Mar 24, 2026
- since Mar 22, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsSources: City of Dallas
Questions about 6310 Del Norte Ln
What is being installed at 6310 Del Norte Ln?
Dallas permits indicate residential roof-mounted solar work, including installation of a new system after removal of a defective one.
When were the solar permits filed?
The City of Dallas records were filed March 22 and March 24, 2026.
What does permit RES-SOLAR-25-000650 cover?
The March 22, 2026, permit describes removing a defective system and installing a new system.
What does permit RES-ELC-26-001665 cover?
The March 24, 2026, permit describes residential roof-mounted solar.
Is the work at 6310 Del Norte Ln residential or commercial?
The records classify the permits as residential solar and electrical permits.
Also being built nearby
All of 75225- 6304 Del Norte LnJun 29, 2026Installation of lighting, switches, plugs and meter base · 12 m away
- 6311 Del Norte LnMar 11, 2026We added a pool equipment cover fence22 linear ft to the back28 linear ft on the side4 ft long walk gate in the front · 13 m away
- 6305 Del Norte LnJan 14, 2021Demolition sfd · 17 m away
- 6322 Del Norte LnFeb 23, 2026Yard sewer line replacement · 24 m away
- 6331 Del Norte LnNov 10, 2025Installation of a dedicated underground gas line for a backup generator · 42 m away
- 6343 Del Norte LnNov 10, 2026Electrical work for new construction · 65 m away
- 6348 Del Norte LnFeb 23, 2026Sewer yard line repair · 75 m away
- 6345 Bandera AveApr 1, 2026Relocate gas meter · 105 m away
- 6320 Bandera AveJun 24, 2026Replace all fpe panels, disconnects, and relocating service disconnects outside with a new 1600 amp trans socket. new ground rods, cold water bond, and intersystem bond. we are setting up four 400amp 1 phase disconnects and 1-200 amp disconnect, 1-60amp 3 phase for the only piece of equipment that needs the high-leg · 108 m away
- 6306 Northwood RdSep 15, 2025Ev charger installation with 60a sub panel · 118 m away
- 6359 Bandera AveApr 1, 2026Relocate gas meter · 132 m away
- 6323 Northwood RdDec 12, 2025Relocate gas meter on behalf of atmos · 134 m away
More solar installs in 75225.