6346 Lupton Dr
Dallas, TX 75225
6346 Lupton Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 6346 Lupton Dr, Dallas, TX 75225. The most recent, filed July 30, 2025, covers: “Trenching 13 ft to the issue and making the repair as needed. the prv will also be replaced that is near it in the yard”.
Compiled from City of Dallas records · updated Jul 30, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 30, 2025
- since Jul 30, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectTrenching 13 ft to the issue and making the repair as needed. the prv will also be replaced that is near it in the yard
Trenching 13 ft to the issue and making the repair as needed. the prv will also be replaced that is near it in the yard
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 6346 Lupton Dr
What is being built at 6346 Lupton Dr?
The latest filing (City of Dallas permit RES-PLM-25-003068, July 30, 2025) covers trenching 13 ft to the issue and making the repair as needed. the prv will also be replaced that is near it in the yard.
How many permits and filings does 6346 Lupton Dr have?
1 filing across 1 project, from July 30, 2025 to July 30, 2025.
Is there other construction near 6346 Lupton Dr?
Yes. Nearby filings include 6330 Lupton Dr (install 26kw whole house backup generator with two (2) automatic transfer switches (ats) for each panel, Dec 1, 2025); 6406 Lupton Dr (underground gas line from pool equipment to generator, Oct 31, 2025); 6321 Prestonshire Ln (we are installing (2) 240 volt 50 amp ev charger each with a smart management module device to monitor and shed load. this is a 400a service. load calculations will be included, Jan 21, 2026).
How do I get alerts for new permits at 6346 Lupton Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75225- 6330 Lupton DrDec 1, 2025Install 26kw whole house backup generator with two (2) automatic transfer switches (ats) for each panel · 33 m away
- 6406 Lupton DrOct 31, 2025Underground gas line from pool equipment to generator · 127 m away
- 6321 Prestonshire LnJan 21, 2026We are installing (2) 240 volt 50 amp ev charger each with a smart management module device to monitor and shed load. this is a 400a service. load calculations will be included · 129 m away
- 6346 Stefani DrNov 16, 2020Install lawn sprinkler · 130 m away
- 6322 Prestonshire LnNov 3, 2020Backup generator · 139 m away
- 6347 Stefani DrNov 12, 2026Install 50 gallon electric water heater in garage closet · 142 m away
- 6314 Stefani DrJan 19, 2021Replace or modify existing hvac · 146 m away
- 6314 Prestonshire LnJul 25, 2025Replace 5 ton gas hvac unit · 146 m away
- 6423 Lupton DrMay 19, 2026Replacing two (2) 50 gallon gas water heater · 150 m away
- 6407 Prestonshire LnJun 30, 2026Replacing 4 ton geothermal unit like for like · 173 m away
- 6439 Lupton DrJan 13, 2026Gas relay · 173 m away
- 6446 Lupton DrMay 9, 2025Gas line to generator · 184 m away