6535 Park Ln
Dallas, TX 75225
EV charger installation permitted at 6535 Park Ln
A residential electrical permit filed February 16, 2026, covers installing an EV charger on the interior back wall of the garage at 6535 Park Ln. The permit describes a 60-amp circuit, with the charger commissioned through the Emporia app for 48-amp output.
Summarized from City of Dallas records · updated Feb 16, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 16, 2026
- since Feb 16, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectProposed installation location and wire run:remove the existing 100a 2-pole breaker to vacate space for a new 60a 2-pole breaker in the 200a msp. route the circuit from the panel into the crawlspace, run through the crawlspace, and penetrate up into the garage. hardwire the evse on the interior garage back wall. the charger will be installed on a 60a circuit and must be commissioned via the emporia app for a 48a output
Proposed installation location and wire run:remove the existing 100a 2-pole breaker to vacate space for a new 60a 2-pole breaker in the 200a msp. route the circuit from the panel into the crawlspace, run through the crawlspace, and penetrate up into the garage. hardwire the evse on the interior garage back wall. the charger will be installed on a 60a circuit and must be commissioned via the emporia app for a 48a output
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 6535 Park Ln
What is being installed at 6535 Park Ln?
A City of Dallas residential electrical permit describes installing an EV charger in the garage. The permit number is RES-ELC-26-000904.
When was the EV charger permit filed for 6535 Park Ln?
The permit was filed February 16, 2026.
Where will the charger be installed at 6535 Park Ln?
The permit specifies the interior back wall of the garage.
What electrical work does the permit describe at 6535 Park Ln?
The work includes removing an existing 100-amp, 2-pole breaker and adding a 60-amp, 2-pole breaker in the 200-amp main service panel. The charger is to be wired on a 60-amp circuit.
What output is listed for the EV charger at 6535 Park Ln?
The permit says the charger must be commissioned through the Emporia app for 48-amp output.
Does the record show a new home being built at 6535 Park Ln?
The record is for a residential electrical permit to install an EV charger; it does not describe new home construction.
Also being built nearby
All of 75225- 6541 Park LnJul 11, 2025Replace 3.5 ton complete · 11 m away
- 6534 Park LnDec 1, 2025Replace roof shingles with gaf timberline hdz · 13 m away
- 6530 Desco DrJan 14, 2021Replace or modify existing hvac · 107 m away
- 6522 Desco DrJun 11, 2025Remove and replace 2 full hvac systems · 108 m away
- 6543 Woodland DrMay 15, 2026Removing shingles and felt down to the decking. inspect for any rotted decking. install new flashing in necessary areas. install drip edge. install synthetic felt. install class 4 duration storm shingles. install new gutter system. haul off trash · 111 m away
- 6523 Desco DrJan 27, 2021Install drive approach and city walk · 121 m away
- 6505 Woodland DrJun 12, 20265 ton complete · 122 m away
- 6526 Woodland DrApr 29, 2026New sidewalk, curb repair, new approach · 124 m away
- 6611 Park LnOct 15, 2026Gas line · 141 m away
- 6629 Park LnAug 25, 20265 ton gas complete system horizontal lennox el22/ hvac replacement · 169 m away
- 6434 Park LnSep 13, 2020Gas relay or repair with test · 177 m away
- 6606 Desco DrAug 1, 2026Lights and a switch · 179 m away