6722 Stefani Dr

Dallas, TX 75225

EV charger and generator load-shed work at a Dallas home

A residential electrical permit filed October 8, 2026, indicates work to hardwire an EV charger and add a generator load-shed module at 6722 Stefani Dr. The permit description also says an existing NEMA 14-50 receptacle will be removed; it does not indicate a new building.

Summarized from City of Dallas records · updated Oct 8, 2026

Projects
3
3 filings
Latest filing
Oct 8, 2026
since Jan 14, 2021
Largest scope
—
Listed value
$7K
partial · often understated

Permit & project history

3 projects
  1. Exiting circuit was setup with a 50 amp breaker and a nema 14-50.removing the nema 14-50adding a generator load shed module (ems device that prevents the generator from overloading)hardwiring an ev charger for 40a or charge on a 50 amp circuit

    Exiting circuit was setup with a 50 amp breaker and a nema 14-50.removing the nema 14-50adding a generator load shed module (ems device that prevents the generator from overloading)hardwiring an ev charger for 40a or charge on a 50 amp circuit

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-26-006253
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replace water heater & replace/test gas service

    Replace water heater & replace/test gas service

    City of Dallas permitPlumbing (PL) Single Family Alteration$7K
    Record
    2101143031
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Electrical repairs

    Electrical repairs

    City of Dallas permitElectrical (EL) Single Family Alteration$2
    Record
    1909033101
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 6722 Stefani Dr

What is being built at 6722 Stefani Dr?

The October 8, 2026, Dallas electrical permit indicates electrical upgrades for an EV charger and generator load management, not construction of a new building.

Is an EV charger planned for 6722 Stefani Dr?

A City of Dallas permit filed October 8, 2026, describes hardwiring an EV charger for 40 amps or charging on a 50-amp circuit.

What electrical work is planned at 6722 Stefani Dr?

Permit RES-ELC-26-006253 describes adding a generator load-shed module, removing a NEMA 14-50 receptacle, and hardwiring an EV charger.

Why is a generator load-shed module being installed at 6722 Stefani Dr?

The permit description says the module is an energy management device that prevents the generator from overloading.

When was the electrical permit filed for 6722 Stefani Dr?

The City of Dallas permit, RES-ELC-26-006253, was filed October 8, 2026.

Was other work permitted at 6722 Stefani Dr?

A separate Dallas plumbing permit filed January 14, 2021, covered replacing a water heater and replacing and testing the gas service.