6805 W Northwest Hwy
Dallas, TX 75225
Electric water heater replacement permitted at 6805 W Northwest Hwy
A City of Dallas commercial plumbing permit records replacement of an electric water heater at 6805 W Northwest Hwy. The permit was filed July 16, 2025; it does not describe new construction.
Summarized from City of Dallas records · updated Jul 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 16, 2025
- since Jul 16, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6805 W Northwest Hwy
What is being built at 6805 W Northwest Hwy?
The permit record describes replacement of an electric water heater, not a new building. It is City of Dallas permit COM-PLM-25-000825, filed July 16, 2025.
Is a new building planned at 6805 W Northwest Hwy?
The available record does not indicate new construction. It covers an electric water heater replacement under commercial plumbing permit COM-PLM-25-000825.
What does permit COM-PLM-25-000825 cover?
It covers replacing an electric water heater at 6805 W Northwest Hwy. The City of Dallas permit was filed July 16, 2025.
When was the water heater replacement permitted at 6805 W Northwest Hwy?
The City of Dallas permit was filed July 16, 2025.
Is the project at 6805 W Northwest Hwy a commercial project?
The record classifies it as a commercial plumbing permit for replacement of an electric water heater. It does not provide a project valuation or square footage.
Also being built nearby
All of 75225- 6811 W Northwest HwyJul 6, 2026Gas line repairs. atmos disconnected gas service · 8 m away
- 6717 W Northwest HwyDec 19, 2025Remodeling the towers on the two buildings · 113 m away
- 6713 W Northwest HwyJun 2, 20261/2" rpz replacement for ice maker · 118 m away
- 6707 W Northwest HwyNov 13, 2026Replace backflow preventer 1-1/4" wilkins 975xl-rp sn: 689198 for main line · 126 m away
- 8610 Turtle Creek BlvdOct 1, 2026Replacing 50 gallon electric water heater · 137 m away
- 8616 Turtle Creek BlvdJul 29, 2026Changeout existing hvac: install 3.5 ton 16 seer split system with roof-mounted condenser and new upflow air handler, add 4? filter cabinet, inline float switch, honeywell thermostat, replace disconnect, reuse whip, reinstall uv bulb, and test heating/cooling. no structural change. roof lift (crane/hoist) required to place condenser on roof · 141 m away
- 8500 Hillcrest Road · Temple Emanu-ElNov 8, 2024Temple emanu-el perimeter security improvements — new construction — new guard house, new security cart parking/charging pavilion, perimeter fencing/barriers, landscaping, paving · 148 m away
- 8500 Hillcrest RdAug 15, 2025Installation of a mini split cassette, refrigerant lines, condensate drain, thermostat · 148 m away
- 8611 Hillcrest Road · Hillcrest CrossingAug 23, 20242nd floor capital improvements — renovation/alteration — capital improvements - renovation to existing multi-tenant corridor and elevator lobby · 173 m away
- 8611 Hillcrest RdAug 11, 2026Installed new 20 gallon electric water heater with new flexible supply lines and t&p line connection · 173 m away
- 6723 Del Norte LnDec 11, 2020Foundation repair · 356 m away
- 6719 Del Norte LnOct 24, 2025Replace gas control valve · 358 m away