7839 Park Ln
Dallas, TX 75225
Electrical, plumbing and alteration work at 7839 Park Ln
Dallas permits indicate commercial electrical, plumbing and alteration work at 7839 Park Ln, rather than a documented new building. Filings from August 25 through November 6, 2025, include minor framing, electrical and plumbing work, seven lavatories, a shower and water heater, electrical outlets, and replacement of a backflow device for a soda system; that plumbing record references Panera Bread.
Summarized from City of Dallas records · updated Nov 6, 2025
- Projects
- 5
- 5 filings
- Latest filing
- Nov 6, 2025
- since Aug 25, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsSources: City of Dallas
Questions about 7839 Park Ln
What is being built at 7839 Park Ln?
The permits describe commercial alterations and electrical and plumbing work, not a new building. Work listed includes minor framing, seven lavatories, a shower, a water heater and added electrical outlets.
Is a new restaurant opening at 7839 Park Ln?
The records do not announce a new restaurant opening. A plumbing permit dated October 30, 2025, references replacing a backflow device for a soda system and includes the name Panera Bread.
What plumbing work is permitted at 7839 Park Ln?
Permit COM-PLM-25-002373, filed October 30, 2025, lists seven lavatories, water and drain work, a shower enclosure and a water heater. A second plumbing permit that day covers a replacement backflow device for a soda system.
What electrical work is planned at 7839 Park Ln?
A City of Dallas electrical permit filed November 6, 2025, lists added electrical outlets. The permit number is COM-ELC-25-003030.
What does the alteration permit at 7839 Park Ln cover?
Permit COM-ALT-ADD-25-000979, filed August 25, 2025, describes minor framing, electrical and plumbing work.
What is happening near Htpn - Weight Loss Expansion on North Central Expressway?
At 7839 Park Ln, 307 meters from Htpn - Weight Loss Expansion at 9101 N Central Expressway, City of Dallas permits filed between August 25 and November 6, 2025, describe commercial alteration, electrical and plumbing work.
Also being built nearby
All of 75225- 7831 Park LnFeb 11, 2026Parking garage 2 - replace 3/4" rpz backflow device · 8 m away
- 7827 Park LnAug 19, 2025Build a new metal fence 7' tall by 75' 6'' long. east side of the building. fence will start on the corner of the building and will run across and finish in the adjacent wrought iron metal fence from our redeemer lutheran church · 12 m away
- 11 Glenmeadow CtJul 23, 2026Install two 50 gallon gas water heater in the attic · 203 m away
- 17 Glenmeadow CtFeb 27, 2026Replaced meter can due to damage at line side. need to complete emergency inspection to get power back to home · 206 m away
- 9 Glenmeadow CtNov 12, 2026Installed one gas tankless water heater · 209 m away
- 10 Glenmeadow CtJul 2, 2026Residential reroofremove old shingle layerreplace with new shingle layer · 209 m away
- 6 Glenmeadow CtJan 29, 2026Replacing a 200 amp panel, a 200 amp main disconnect, a 150 amp disconnect, grounding and surge protection · 217 m away
- 7611 Park Ln · Our Redeemer Lutheran Church And SchoolSep 14, 2026Dsst-pvt our redeemer fence install 6' tall aluminum fence and (2) automatic slide gates removal of existing fence for construction. fence will be replaced after construction has completed · 219 m away
- 4 Glenmeadow CtApr 30, 2026Qualifications 1. demolition 25 sq ft cement & patch as needed for new plumbing drains in slab, excavate access hole in slab at powder for 3" up 2. trench and install new drain lines in slab per plan, does not include any slab cable repairs or cement beam demolition (if required) 3. install pex water piping from existing supply lines overhead and below slab as needed to new fixture locations per plan 4. install one washer box and one ice maker box with air hammer arrestors per code 5. install single shower valve and wall mount head at each shower location, two included at master shower only 6. relocate gas lines in attic for new framing changes, relocate wh gas, add gas for two new hvac units and patio grill 7. install new tile shower drain and liner with cement slope and city test at all showers 8. relocate master sink and shower copper water lines in slab as needed. plumb for freestanding valve in slab at master tub. 9. remove 2 tank whs in attic, relocate to lines to attic, install tankless wh, cond to sink, dual pvc vents, (2) circ tees at trim 10. tap existing 3" pvc on garage wall & install horizontal drain along bottom of joists for rear up bath, gc to cover pvc 11. reuse exisiting gas piping system and sizing, bid does not include any upsize to service or interior trunk lines 12. any work additional to qualifications or plumbing scope is billed as additional at t&m rate · 218 m away
- 24 Glenmeadow CtAug 26, 2026Tear off existing roof system down to decking. install chimney crickets, ice and water shield, underlayment and ludowici tiles in grey color · 219 m away
- 8975 Boedeker StDec 8, 2025Install power to a att small cell node support pole · 253 m away
- 9101 N Central ExpyNov 10, 2026Baylor scott & white weight loss clinic is an existing tenant in suite 420 with plans to expand into adjoining suites 425 & 430. the project will include demolition of existing walls, construction of new walls, mechanical, electrical, and light plumbing · 307 m away