2550 Pacific Ave
Dallas, TX 75226 · The Epic-Building Lobby Remodel, The Epic 9th Floor Spec Suites + 1 more
Permits filed for new spec suites at 2550 Pacific Ave
City of Dallas permits filed Nov. 4, 2026, indicate commercial alterations for new spec suites at 2550 Pacific Ave. The work includes suites 1010, 1020 and 1030, along with an elevator lobby and corridor; the records do not list a project valuation.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Nov 4, 2026
- Projects
- 26
- 26 filings
- Latest filing
- Nov 4, 2026
- since Dec 2, 2020
- Largest scope
- 4,240 sf
- Estimated cost
- $2.5M
- state registration
Where this project stands
CompletedThe Epic-Building Lobby Remodel
4,240 sq ft · $340K est.
- RegisteredMar 8, 2024
- Plan review
- ConstructionApr '24 – Jul '24
- Inspected
- Closed
Ran as a 4-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
26 projectsInterior finish0out of existing building lobby — the epic
TDLR project registrationRenovation/AlterationProject Closed4,240 sq ft$340K est.- Project #
- TABS2024013458
- Tenant / owner
- The Epic-Building Lobby Remodel
- Design firm
- Pro
- Contact
- Pro
Renovation of existing office space — the epic
TDLR project registrationRenovation/AlterationProject Closed22,573 sq ft$2.5M est.- Project #
- TABS2024003293
- Tenant / owner
- The Epic 9th Floor Spec Suites
- Design firm
- Pro
- Contact
- Pro
Partial remodel of existing offices and common areas. — the epic
TDLR project registrationRenovation/AlterationProject Closed1,881 sq ft$50K est.- Project #
- TABS2023013627
- Tenant / owner
- Spaces #5136 The Epic
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 2550 Pacific Ave
What is being built at 2550 Pacific Ave?
City of Dallas permits indicate new commercial spec suites, along with work on an elevator lobby and corridor. The permits were filed Nov. 4, 2026.
When were the permits filed for 2550 Pacific Ave?
The four City of Dallas commercial alteration permits were filed Nov. 4, 2026.
Which suites are included in the 2550 Pacific Ave permits?
The permits describe new spec suites 1010, 1020 and 1030, as well as an elevator lobby and corridor.
What are the permit numbers for the work at 2550 Pacific Ave?
The permits are COM-ALT-ADD-26-002619 for the elevator lobby and corridor, COM-ALT-ADD-26-002630 for suite 1030, COM-ALT-ADD-26-002629 for suite 1020, and COM-ALT-ADD-26-002628 for suite 1010.
What's being built at 2550 Pacific Ave near DLR Group Dallas Studio Expansion?
Permits for 2550 Pacific Ave indicate commercial alterations to create spec suites 1010, 1020 and 1030, plus work on an elevator lobby and corridor. The permits were filed Nov. 4, 2026.
Is a new business opening at 2550 Pacific Ave?
The permits describe spec suites but do not identify a business or tenant.
Also being built nearby
All of 75226- 2550 Pacific Avenue · Epic Dallas Office LPMar 8, 2024Amenity — renovation/alteration — interior finish-out of existing office space
- 2550 Pacific Avenue · Epic Dallas Office, LPNov 2, 2026Epic spec suites - 10th floor suite 1000 — renovation/alteration — 2,400sf of renovation to a first-generation space for a spec suite, elevator lobby and common corridor
- 2500 Pacific Avenue · Epic Phase 2 Qozb, LPApr 18, 2024Uber dallas security relocation — renovation/alteration — renovate existing conference room space into a shared office space, divide existing storage room into an av closet and storage closet · 48 m away
- 2500 Pacific Ave · Cim Group Inc. Dba Epic Phase 2 Qozb LPJun 29, 2026Plumbing · 48 m away
- 2511 Swiss AveApr 2, 2026Install two- 10 ton side discharge rooftop units with 120ft spiral duct · 128 m away
- 2511 Swiss Ave · Greenway Good Latimer LPMar 25, 2026Ctrl room — renovation/alteration — patio rebrand to include addition of roof, hvac, and fire sprinkler to existing space · 128 m away
- 2439 Swiss AveAug 11, 2025Running 750 feet of gas pipe on top of the roof to the new gas meter location for atmos · 133 m away
- 2525 Elm StAug 13, 2025No electrical work done, need inspection for electrical release · 136 m away
- 2540 Elm StNov 11, 2026Continuation of plumbing works · 161 m away
- 2551 Elm Street · Epic Dallas Hotel, LPJul 3, 2024The pittman hotel-conference center — renovation/alteration — finish-out of existing 1st generation shell space · 162 m away
- 2544 Elm StOct 26, 2026Clean and show permit (no work) · 165 m away
- 2554 Elm St · Westdale Asset ManagementNov 25, 2024Tenant finish out of existing third floor space and terrace · 176 m away