2639 Elm Street
Dallas, TX 75226 · Elm Street Lofts, Ltd. Westdale Asset Management
The Boil Daddy Deep Ellum restaurant remodel
A 2,840-square-foot interior remodel of an existing restaurant space for The Boil Daddy Deep Ellum was registered on February 5, 2024. The TDLR registration lists an estimated project cost of $102,900 and a status of Project Closed.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 5, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 5, 2024
- since Feb 5, 2024
- Largest scope
- 2,840 sf
- Estimated cost
- $103K
- state registration
Where this project stands
CompletedThe Boil Daddy Deep Ellum
2,840 sq ft · $103K est.
- RegisteredFeb 5, 2024
- Plan review
- ConstructionFeb '24 – Feb '24
- Inspected
- Closed
Ran as a 1-month build.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectMinor interior remodeling of existing restaurant space for a new restaurant. — the boil daddy deep ellum
TDLR project registrationRenovation/AlterationProject Closed2,840 sq ft$103K est.- Project #
- TABS2024010794
- Tenant / owner
- The Boil Daddy Deep Ellum
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2639 Elm Street
What is being built at 2639 Elm Street in Dallas?
A TDLR registration describes a minor interior remodel of an existing restaurant space for a new restaurant, The Boil Daddy Deep Ellum. The project covers 2,840 square feet.
When was the restaurant project at 2639 Elm Street filed?
The project was registered with the Texas Department of Licensing and Regulation on February 5, 2024. Its registration number is TABS2024010794.
How much will the 2639 Elm Street restaurant remodel cost?
The applicant's TDLR registration estimates the project cost at $102,900. This is an estimate, not a confirmed final cost.
Is a new restaurant going in near 2634 Elm St?
The Boil Daddy Deep Ellum is listed for an interior remodel at 2639 Elm Street, about 14 meters from 2634 Elm St. The project description identifies it as a new restaurant in an existing restaurant space.
Is the 2639 Elm Street project complete?
The TDLR record lists the project status as Project Closed. That status does not confirm whether the restaurant is currently open.
How large is The Boil Daddy Deep Ellum project?
The registered project area is 2,840 square feet. The work is described as a minor interior remodel of an existing restaurant space.
Also being built nearby
All of 75226- 2638 Elm StJul 18, 2025Gas test only for gas meter release · 13 m away
- 2634 Elm St · 2634 Elm St LLCJul 21, 2026Nosta — renovation/alteration — remodel + interior finish out with some exterior improvements · 14 m away
- 2625 Elm StDec 3, 2020Install rpz · 19 m away
- 2624 Elm StFeb 3, 2026Clean and show permit · 23 m away
- 2614 ElmMar 6, 2026Gas inspection · 35 m away
- 2610 Elm St · Westdale Real Estate Investment & ManagementApr 9, 2024Cafe salsera — renovation/alteration — 2nd generation restaurant remodel / finish out · 40 m away
- 2608 Elm StApr 14, 2026Cap and remove 3/4" watts ss009m3 sn: 00708. not connected or serving anything · 43 m away
- 211 N Good Latimer ExpyJun 4, 2026Install underground conduit to provide power to wayfinding kiosk · 75 m away
- 2633 Main StMar 24, 2026This is a clean & show only. i will upload proof of vacancy · 81 m away
- 2617 Main StApr 28, 2026Feeding power to the kiosk · 83 m away
- 2639 Main St · Ap Deep Ellum LLCAug 13, 2026The linden — renovation/alteration — interior remodel of existing suite into a restaurant. 3598 sq ft · 84 m away
- 2639 Main StJan 26, 2026Scope of work consists of selective interior demolition within an existing second-generation restaurant tenant space. demolition is limited to the existing office/storage area as shown on the selective interior demolition plan. no restroom demolition or modification is included. no structural demolition or exterior work is proposed. all abandoned utilities will be capped per code by licensed trades · 84 m away