3201 Main St
Dallas, TX 75226
Permits indicate a 30-unit, three-story apartment building
City of Dallas permits indicate a new 30-unit, three-story multifamily building at 3201 Main St. A plumbing permit dated May 29, 2026, describes the project as “Westdale deep ellum”; related new-construction permits were filed from March 30 through August 20, 2026.
Summarized from City of Dallas records · updated Aug 20, 2026
- Projects
- 16
- 16 filings
- Latest filing
- Aug 20, 2026
- since Mar 30, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
16 projectsInstall a sanitary sewer lateral, a 2" irrigation service and a 6" domestic water supply combo with fireline
Install a sanitary sewer lateral, a 2" irrigation service and a 6" domestic water supply combo with fireline
City of Dallas permitCommercial Plumbing PermitInstall a 6" sewer lateral, a 2" irrigation service and a 6" water service in combination with a 6" fire vault
Install a 6" sewer lateral, a 2" irrigation service and a 6" water service in combination with a 6" fire vault
City of Dallas permitCommercial Plumbing PermitQteam meeting 12.3.2025 - not using sb840, confirmed with applicantconstruct new 3-story 30-unit multifamily dwelling building and related site work on existing site
Qteam meeting 12.3.2025 - not using sb840, confirmed with applicantconstruct new 3-story 30-unit multifamily dwelling building and related site work on existing site
City of Dallas permitCommercial New Construction Permit
Sources: City of Dallas
Questions about 3201 Main St
What is being built at 3201 Main St in Dallas?
City permits indicate a 30-unit, three-story multifamily building. A May 29, 2026, plumbing permit describes it as “Westdale deep ellum.”
How many apartments are planned at 3201 Main St?
A City of Dallas plumbing permit describes a 30-unit, three-story project. The permit, COM-PLM-26-002006, was filed May 29, 2026.
When were permits filed for 3201 Main St?
The records provided span March 30 through August 20, 2026. A permit describing the project as a 30-unit, three-story building was filed May 29, 2026.
Is 3201 Main St a new apartment building?
The permits indicate new multifamily construction. An electrical permit filed April 23, 2026, describes an electrical installation for a new three-story multifamily dwelling.
What utility work is permitted at 3201 Main St?
City permits include sewer, water, irrigation, fireline and on-site storm utility work. The latest record provided, COM-PLM-26-003250, was filed August 20, 2026.
Also being built nearby
All of 75226- 3300 Main StJul 30, 2026Gas test · 79 m away
- 3306 Main StJun 15, 2026Qteam meeting 7.8.26 (all day) **meeting cancelled per applicant’s request*** a construct new 2-story addition on top of exisitng first floor and remodel existing vacant floor space first floor adding 16-untis to the existing 35 unit multifamily dwelling building. no paving or grading proposed · 84 m away
- 3309 Elm St. 115 · 3309 Elm Owner LLCApr 18, 2025Tatsu expansion — renovation/alteration — renovation of existing kitchen and dining space for new operator · 85 m away
- 3309 Elm Street Dallas, TX 75226 · August Real Estate Co.Apr 17, 2025Suite 150 — renovation/alteration — the scope of this project is a non-structural interior finish-out in an existing single floor suite. scope includes hvac, electrical, plumbing · 85 m away
- 3309 Elm StOct 26, 2026Install conduit and wire from 480 volt panel to suite 130 for a reactor and heat chamber · 85 m away
- 3102 Main StDec 7, 2020Install type ii vent-a-hood · 102 m away
- 232 N Trunk AveDec 2, 2020Install water heater · 112 m away
- 3301 Elm StAug 25, 2026Connect and disconnect surge protection installation · 134 m away
- 3401 Main StJul 14, 2025Moved for gas line for atmos 84ft pipe to furnace · 167 m away
- 3405 Main StNov 12, 2026Gas test · 169 m away
- 3408 N Main StNov 10, 2026Clean and show · 171 m away
- 3209 Canton StJun 18, 2026Gas pressure test · 183 m away