2414 S Buckner Blvd
Dallas, TX 75227 · Dutch Bros Dallas TX, Frost Bank - Pleasant Grove Financial Center
Dutch Bros and Frost Bank projects planned at 2414 S Buckner Blvd
Permits indicate a multi-tenant site with a new Dutch Bros coffee shop offering drive-through and walk-up service, alongside a new Frost Bank with drive-through motor bank lanes. Dallas permits for the projects were filed June 25 and June 8, 2026, respectively; TDLR registrations were filed May 20 and March 31.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Jun 25, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Jun 25, 2026
- since May 19, 2025
- Largest scope
- 4,540 sf
- Estimated cost
- $10M
- state registration
Where this project stands
Finishing up · inspection nextDutch Bros Dallas TX
986 sq ft · $1.3M est.
- RegisteredMay 20, 2026
- Plan review
- ConstructionAug '26 – Oct '26
- Inspectednow
- Closed
Scheduled to finish Oct 30, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
6 projectsQteam meeting 6.17.26 (all day)- construct new 1-story ground up bank building with drive thru
Qteam meeting 6.17.26 (all day)- construct new 1-story ground up bank building with drive thru
City of Dallas permitCommercial New Construction PermitNew construction of dutch bros coffee with drive thru and walk up services only. — dutch bros coffee
TDLR project registrationNew ConstructionReview Complete986 sq ft$1.3M est.- Project #
- TABS2026020755
- Tenant / owner
- Dutch Bros Dallas TX
- Design firm
- Pro
- Contact
- Pro
The project generally consists of new concrete parking lots and driveways, pavement striping, accessible signage, and sidewalks surrounding the building. electrical power will be overhead from existing transformer service. new work will include dumpster enclosure, steel bollards to protect bank equipment, and an enclosed electrical yard. site utilities include new sanitary sewer and domestic water extended from existing mains serving the site. new landscaping and irrigation will also be included. the one-story building will have 4,540 gross square feet with a 1,100-sq ft covered motor bank. the structure will be steel framing with structural slab foundation. exterior walls will be stone veneer and plaster. windows will include aluminum storefront and bulletproof glass in armored aluminum storefront frames. overhangs will include exterior plaster and composite metal wall panels. the roof will be a modified system over tapered insulation. interior finishes will include aluminum frames, wood doors, hardware, metal studs and gypsum board partitions, acoustical panel ceilings, tile, paint, bank equipment, and custom interior millwork. mechanical, electrical, and plumbing systems will be provided including restrooms and plumbing fixtures
The project generally consists of new concrete parking lots and driveways, pavement striping, accessible signage, and sidewalks surrounding the building. electrical power will be overhead from existing transformer service. new work will include dumpster enclosure, steel bollards to protect bank equipment, and an enclosed electrical yard. site utilities include new sanitary sewer and domestic water extended from existing mains serving the site. new landscaping and irrigation will also be included. the one-story building will have 4,540 gross square feet with a 1,100-sq ft covered motor bank. the structure will be steel framing with structural slab foundation. exterior walls will be stone veneer and plaster. windows will include aluminum storefront and bulletproof glass in armored aluminum storefront frames. overhangs will include exterior plaster and composite metal wall panels. the roof will be a modified system over tapered insulation. interior finishes will include aluminum frames, wood doors, hardware, metal studs and gypsum board partitions, acoustical panel ceilings, tile, paint, bank equipment, and custom interior millwork. mechanical, electrical, and plumbing systems will be provided including restrooms and plumbing fixtures
City of Dallas permitCommercial New Construction PermitConstruction of new frost bank with drive-thru motor bank lanes. — frost bank - pleasant grove financial center
TDLR project registrationNew ConstructionReview Complete4,540 sq ft$10M est.- Project #
- TABS2026016350
- Tenant / owner
- Frost Bank - Pleasant Grove Financial Center
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 2414 S Buckner Blvd
What is being built at 2414 S Buckner Blvd in Dallas?
Permit records describe a multi-tenant site with a Dutch Bros coffee shop and a new Frost Bank financial center. Both projects include drive-through service.
Is a Dutch Bros being built at 2414 S Buckner Blvd?
Yes. A Dallas commercial new construction permit filed June 25, 2026 (COM-NEW-26-000206), describes a new Dutch Bros with drive-through and walk-up service.
What are the plans for the Frost Bank at 2414 S Buckner Blvd?
Records describe a new Frost Bank with drive-through motor bank lanes. The TDLR registration, filed March 31, 2026, lists a 4,540-square-foot project.
When were permits filed for the projects at 2414 S Buckner Blvd?
Dallas filed a commercial new construction permit for the bank on June 8, 2026 (COM-NEW-26-000172), and one for Dutch Bros on June 25, 2026 (COM-NEW-26-000206). TDLR registrations were filed March 31 and May 20, respectively.
How large is the Dutch Bros project at 2414 S Buckner Blvd?
The TDLR registration for Dutch Bros lists 986 square feet. It describes drive-through and walk-up service.
Is the site at 2414 S Buckner Blvd a single-tenant building?
The records describe separate Dutch Bros and Frost Bank projects at the address, so it is a multi-tenant site rather than a single-tenant building.
Also being built nearby
All of 75227- 2404 S Buckner BlvdAug 19, 2026New construction of dutch bros coffee with drive-thru and walk-up services only · 18 m away
- 2445 S Buckner Blvd · Almass Investment Group, LPSep 22, 2025Requesting power release for existing commercial space. no electrical work performed. clean & show (as-is) · 39 m away
- 2446 S Buckner BlvdSep 11, 2025Installing new traffic signals and side walks at intersection of s buckner blvd @ jennie lee ln · 54 m away
- 2531 S Buckner BlvdOct 12, 2026We have to rough in for 3 shampoo bowl · 138 m away
- 2338 S Buckner BlvdJun 4, 2026Install grease interceptor and connect existing kitchen fixtures to interceptor. add mop sink · 138 m away
- 2336 S Buckner BlvdAug 4, 2025Clean and show, no work · 141 m away
- 2432 Fonville DrMar 26, 202655ft gas line replacement / relocate to new meter location set by atmos energy / gas test · 156 m away
- 2511 Fonville DrFeb 26, 2026Relocate gas line · 175 m away
- 8158 Jennie Lee LnOct 7, 2020Remove existing roof and install new roof · 192 m away
- 2537 Fonville DrJan 11, 2026Install gas service · 193 m away
- 2300 S Buckner BlvdDec 4, 2025Gas test · 206 m away
- 2322 Fonville DrAug 5, 2025Gas leak repair · 233 m away