3103 Pruitt Ave
Dallas, TX 75227
3103 Pruitt Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 3103 Pruitt Ave, Dallas, TX 75227. The most recent, filed December 27, 2020, covers: “Electrical repairs”.
Compiled from City of Dallas records · updated Dec 27, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Dec 27, 2020
- since Dec 27, 2020
- Largest scope
- —
- Listed value
- $6
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 3103 Pruitt Ave
What is being built at 3103 Pruitt Ave?
The latest filing (City of Dallas permit 2012273007, December 27, 2020) covers electrical repairs.
How many permits and filings does 3103 Pruitt Ave have?
1 filing across 1 project, from December 27, 2020 to December 27, 2020.
How much is the construction at 3103 Pruitt Ave worth?
Permits at this address list about $6 in valuations. Permit valuations are often partial and understate total project cost.
What is being built near Family Fuel in Dallas?
3103 Pruitt Ave is about 161 m from Family Fuel (9202 Scyene Rd). Its latest filing is for electrical repairs.
Is there other construction near 3103 Pruitt Ave?
Yes. Nearby filings include 3006 Pruitt Ave (addition of an storage, Jan 9, 2026); 9317 Scyene Rd (install electrical service for a charter power supply cabinet, Mar 27, 2026); 3117 Kingsford Ave (replacing 5 ton gas hvac system, Jul 29, 2025).
How do I get alerts for new permits at 3103 Pruitt Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75227- 3006 Pruitt AveJan 9, 2026Addition of an storage · 74 m away
- 9317 Scyene RdMar 27, 2026Install electrical service for a charter power supply cabinet · 82 m away
- 3117 Kingsford AveJul 29, 2025Replacing 5 ton gas hvac system · 134 m away
- 3117 Cypress AveJun 26, 2025Nsfaa-rebuilt garage · 146 m away
- 3207 Kingsford AveNov 13, 2026Mcr with battery install 15.58kw pv system with 38 modules, 1 battery & mpu · 155 m away
- 9202 Scyene Rd · Family FuelJan 15, 2025Family fuel gas station and convenience store — new construction — the project involved one ground up construction of 7773 sq ft convenience store and gas station with 6 pumps, driveways and parking · 161 m away
- 9115 Scyene RdNov 16, 2026The scope of work includes installing two charles cpad-xfrakit units with one 12’-0” h-frame, one span panel, two new tesla powerwall 3 units, one new tesla gateway 3, one charles fiber box (cube-m01818wb-a), a 200a meter, one meter box, two nodes, and one ground bar. the work also includes installing conduits from the h-frame to the nodes and installing fiber handholes, with the final quantity of handholes to be determined by the contractor · 254 m away
- 3212 Wilbarger DrJul 17, 2025Installation of 34 roof mounted pv solar panels and one battery; disconnect/reconnect needed · 264 m away
- 9117 Scyene RdFeb 18, 2026Electrical cell tower · 266 m away
- 3339 Wilbarger DrMay 19, 2025Re roof only, no redeck. tear off 1 layer, install 25 yr shingles · 277 m away
- 9409 Kerrville StOct 15, 2026Re-roof: no re-deck · 283 m away
- 9411 Culberson StNov 6, 2026Residential roof replacement. remove and dispose of existing asphalt shingles. inspect existing roof decking and replace damaged sections as needed. install new synthetic underlayment, starter shingles, asphalt shingles, ridge caps, drip edge, flashing, pipe boots, and roof ventilation as required. perform final cleanup and debris removal. no structural modifications or changes to existing roof framing · 303 m away