3947 Sheraton Dr
Dallas, TX 75227
3947 Sheraton Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 3947 Sheraton Dr, Dallas, TX 75227. The most recent, filed September 29, 2025, covers: “Service upgrade”.
Compiled from City of Dallas records · updated Sep 29, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 29, 2025
- since Sep 29, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3947 Sheraton Dr
What is being built at 3947 Sheraton Dr?
The latest filing (City of Dallas permit RES-ELC-25-003430, September 29, 2025) covers service upgrade.
How many permits and filings does 3947 Sheraton Dr have?
1 filing across 1 project, from September 29, 2025 to September 29, 2025.
What is being built near St. Philip St. Augustine Catholic Academy in Dallas?
3947 Sheraton Dr is about 324 m from St. Philip St. Augustine Catholic Academy (8151 Military Pkwy). Its latest filing is for service upgrade.
Is there other construction near 3947 Sheraton Dr?
Yes. Nearby filings include 3921 Sheraton Dr (nsfaa-rem/add this project consists of a single-family residential remodel and addition. a portion of the existing structure, totaling approximately 811 square feet, will be demolished, and a new 679-square-foot addition will be constructed at the rear of the house. the remaining existing area will be remodeled. the scope of work includes mechanical, electrical, and plumbing systems, as well as framing and foundation work, Nov 6, 2025); 8146 Astoria Dr (perform gas line repair and replace a 20ft. section of line and gas test, Sep 24, 2026); 3921 S Buckner Blvd (cleaning for a move out for a showing, May 21, 2025).
How do I get alerts for new permits at 3947 Sheraton Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75227- 3921 Sheraton DrNov 6, 2025Nsfaa-rem/add this project consists of a single-family residential remodel and addition. a portion of the existing structure, totaling approximately 811 square feet, will be demolished, and a new 679-square-foot addition will be constructed at the rear of the house. the remaining existing area will be remodeled. the scope of work includes mechanical, electrical, and plumbing systems, as well as framing and foundation work · 51 m away
- 8146 Astoria DrSep 24, 2026Perform gas line repair and replace a 20ft. section of line and gas test · 120 m away
- 3921 S Buckner BlvdMay 21, 2025Cleaning for a move out for a showing · 143 m away
- 8138 Shafter DrOct 2, 2026Complete replacement of the existing residential gas piping system located underneath the house. work includes removing and replacing all gas supply lines, branch lines, fittings, connections, supports, and appliance shutoff valves. the new system will be properly secured and pressure-tested for leaks before inspection and restoration of gas service. all work will be completed in accordance with applicable residential plumbing and fuel-gas codes · 159 m away
- 8155 Shafter DrOct 29, 2025Gas release · 189 m away
- 8178 Nelson DrDec 16, 2020Gas relay or repair with test · 198 m away
- 3952 Warrington DrJun 30, 2026Relocate gas line · 216 m away
- 3928 Warrington DrFeb 24, 2026Mcr with battery carlos hernandez- third-party review- installation of a grid tied, roof mounted, solar pv system with battery · 221 m away
- 4006 Warrington DrJun 26, 2026Gas pressure test · 231 m away
- 4026 Warrington DrSep 18, 2026Wire whole house and installed new electrical service 200amp · 237 m away
- 8151 Military Pkwy · St. Philip St. Augustine Catholic AcademyNov 2, 2026Plumbing sewer service · 324 m away
- 8003 Military PkwyJul 6, 2026Gas test. capped off two wall heaters and dryer service · 360 m away