5821 Everglade Rd
Dallas, TX 75227
Electrical panel replacement permitted at 5821 Everglade Rd
A residential electrical permit for replacing the panel at 5821 Everglade Rd was filed on January 30, 2026. City of Dallas records also show an earlier gas test in 2020 and a roof replacement permit in 2019.
Summarized from City of Dallas records · updated Jan 30, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jan 30, 2026
- since Jan 30, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 5821 Everglade Rd
What is being built at 5821 Everglade Rd?
The latest City of Dallas record is a residential electrical permit to replace an electrical panel, filed January 30, 2026. The records provided do not indicate new construction.
What work was permitted at 5821 Everglade Rd?
The January 30, 2026 permit, RES-ELC-26-000522, covers replacing an electrical panel.
When was the electrical panel permit filed?
The City of Dallas filed permit RES-ELC-26-000522 on January 30, 2026.
Is a new house being built at 5821 Everglade Rd?
The records provided show a permit to replace an electrical panel, not a permit for new home construction.
What other permits are on record for this address?
Records include a gas test permit filed July 7, 2020, and a permit to remove and replace the roof filed October 10, 2019.
Also being built nearby
All of 75227- 5831 Everglade RdSep 21, 2026Gas relase and repair of 2 leaks, master bathroom closet, outside 90 going into the home. access panel will bee installed aftersheet rock repair · 15 m away
- 5814 Twineing StMay 21, 2025Replace drain line from home to city connection, yard sewer only · 82 m away
- 5835 Marview LnAug 1, 2025Replacing the condenser · 98 m away
- 5848 Marview LnDec 10, 2025My company will be removing existing asphalt shingle roof and replacing it with an architectural shingle · 106 m away
- 5720 Everglade RdJan 6, 202650 gallon gas water heater · 139 m away
- 5120 Urban Crest RdJun 15, 2026New gas service line · 158 m away
- 5136 Urban Crest RdJul 8, 2026Gas test + repairs - locked meter · 173 m away
- 5720 Twineing StJan 21, 2026Gas test · 174 m away
- 5804 Hillcroft StJan 9, 2026Gas leak in the main line to the home , replace line to meter (60ft) · 177 m away
- 5016 Urban Crest RdJun 15, 2026Gas test · 185 m away
- 5811 Hillcroft StDec 10, 2020Minor repair gas test · 189 m away
- 5825 Hillcroft StJan 20, 2021Install new hvac · 191 m away