6119 Scyene Rd
Dallas, TX 75227
6119 Scyene Rd solar and battery installation
Dallas permit records indicate a 6.6 kW roof-mounted solar system with 15 panels and a battery at 6119 Scyene Rd. Solar and electrical permits were filed January 26, 2026; an earlier plumbing permit, filed June 17, 2025, covers a new sewer line in the yard.
Summarized from City of Dallas records · updated Jan 26, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jan 26, 2026
- since Jun 17, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsMcr with battery install a 6.600 kw roof mounted pv solar system - 15 panels, a tesla powerwall-3, tesla energy gateway-3 & enphase iq gateway. electrician shutdown needed to install tesla energy gateway-3 between te ecb and new span panel
Mcr with battery install a 6.600 kw roof mounted pv solar system - 15 panels, a tesla powerwall-3, tesla energy gateway-3 & enphase iq gateway. electrician shutdown needed to install tesla energy gateway-3 between te ecb and new span panel
City of Dallas permitResidential Solar/PV PermitInstall a 6.600 kw roof mounted pv solar system - 15 panels, a tesla powerwall-3, tesla energy gateway-3 & enphase iq gateway. electrician shutdown needed to install tesla energy gateway-3 between te ecb and new span panel
Install a 6.600 kw roof mounted pv solar system - 15 panels, a tesla powerwall-3, tesla energy gateway-3 & enphase iq gateway. electrician shutdown needed to install tesla energy gateway-3 between te ecb and new span panel
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 6119 Scyene Rd
What is being installed at 6119 Scyene Rd?
Dallas permit records describe a 6.6 kW roof-mounted solar system with 15 panels, a Tesla Powerwall 3, and related electrical equipment. The solar and electrical permits are dated January 26, 2026.
Is there a battery included with the solar installation at 6119 Scyene Rd?
Yes. The January 26, 2026 permits list a Tesla Powerwall 3, a Tesla Energy Gateway 3, and an Enphase IQ Gateway along with the solar panels.
How many solar panels are planned for 6119 Scyene Rd?
The description in Dallas permit RES-SOLAR-25-000743 specifies 15 roof-mounted panels in a 6.6 kW system.
When were permits filed for the work at 6119 Scyene Rd?
The solar and electrical permits were filed January 26, 2026. A separate permit for a new sewer line in the yard is dated June 17, 2025.
What is permit RES-ELC-26-000452 for at 6119 Scyene Rd?
It is a residential electrical permit dated January 26, 2026, describing electrical work for a 6.6 kW rooftop solar system with 15 panels, a Tesla Powerwall 3, and related equipment.
Also being built nearby
All of 75227- 6102 Greenmere PlJun 11, 2025Service repair only, tree fell on the service · 103 m away
- 3023 Lasca StNov 11, 2025Gas test for new service · 110 m away
- 6209 Scyene RdJul 8, 2025Nsfaa-16x14x11 ft 10 inch shed no electric or plumbing no green · 127 m away
- 6035 Scyene RdAug 14, 20263 ton basic gas system · 134 m away
- 6031 Greenmere PlMay 7, 2026Relocate meter and panel · 174 m away
- 6203 Latta StDec 29, 2025Gas test · 182 m away
- 6017 Greenmere PlJul 7, 2026Service no work. gas has been off more than 3 months, putting gas test on and inspection for gas be turned on · 191 m away
- 6224 Latta StJun 25, 2025Replace water heater · 211 m away
- 6230 Latta StJul 25, 2025Gas test & repair · 218 m away
- 6022 Hollis AveSep 21, 2025Fresh water repipe/reroute of all lines under home · 262 m away
- 6311 Scyene RdAug 14, 2026Replace 3 tom complete gas system · 279 m away
- 6315 Scyene RdDec 20, 2025Gas test · 290 m away
More solar installs in 75227.