10829 Estacado Dr
Dallas, TX 75228
10829 Estacado Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 10829 Estacado Dr, Dallas, TX 75228. The most recent, filed January 28, 2021, covers: “Install new hvac”.
Compiled from City of Dallas records · updated Jan 28, 2021
- Projects
- 1
- 1 filings
- Latest filing
- Jan 28, 2021
- since Jan 28, 2021
- Largest scope
- —
- Listed value
- $55
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 10829 Estacado Dr
What is being built at 10829 Estacado Dr?
The latest filing (City of Dallas permit 2101283031, January 28, 2021) covers install new hvac.
How many permits and filings does 10829 Estacado Dr have?
1 filing across 1 project, from January 28, 2021 to January 28, 2021.
How much is the construction at 10829 Estacado Dr worth?
Permits at this address list about $55 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 10829 Estacado Dr?
Yes. Nearby filings include 10840 Estacado Dr (repair and replace electrical panel, Dec 4, 2025); 10848 Estacado Dr (gas release/gas test, Oct 9, 2026); 10857 Estacado Dr (damaged in storm, Mar 11, 2026).
How do I get alerts for new permits at 10829 Estacado Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75228- 10840 Estacado DrDec 4, 2025Repair and replace electrical panel · 33 m away
- 10848 Estacado DrOct 9, 2026Gas release/gas test · 39 m away
- 10857 Estacado DrMar 11, 2026Damaged in storm · 46 m away
- 10943 Desdemona DrOct 16, 2026Install new gas relay · 95 m away
- 2065 Farola DrApr 22, 2026Gas test · 150 m away
- 1915 Farola DrMay 15, 2026Replacing the water yard service · 152 m away
- 2064 Farola DrApr 21, 2026Gas test · 153 m away
- 1920 Farola DrJan 22, 2026Gas test · 158 m away
- 11012 Castolon DrJun 19, 2026Gas test · 162 m away
- 10908 Estacado DrJul 7, 2025Mcr new pv system design20 modules - 7.400 kw dc, 5.800 kw ac system size · 172 m away
- 11003 Castolon DrOct 30, 2020Upgrade existing electrical service · 172 m away
- 10822 Castolon DrSep 22, 2025New construction install for hvac · 226 m away